For the new projects invested by the government or mainly by the government, the BIM application cost can be included in the total project construction investment according to the notice on printing and distributing the reference basis for pricing the promotion and application cost of building information model (BIM) technology in Zhejiang Province (ZJJ [2017] No
.
3) and “Shaoxing green building special planning (2017-2025)” The implementation rules are hereby formulated
.
Other counties, cities (districts) to implement residential decoration of the central area of the scope of the territory to their own clear regional scope
.
It is up to all localities to decide whether the government’s resettlement housing should be constructed by steel structure assembly
.
According to the local economic development and market acceptance, all localities formulate relevant implementation rules for full decoration of residential buildings, strengthen the demand orientation, and clarify the minimum decoration standards
.
91).
.
The design and construction process shall follow the green concept, actively adopt green technology, make rational use of various resources, and realize low-carbon and ecological development The objective is to implement the one-star green building for the ancillary buildings with the floor area of no more than 1000 square meters
.
Government investment refers to the use of financial funds at all levels of investment and state-owned enterprises (units) use all kinds of sources of capital investment
.
The scope of the central urban area of Shaoxing shall be subject to the scope of the central urban area determined by the approved master plan of Shaoxing City (after the approval and implementation of the master plan of land and space of Shaoxing City, the approved master plan of land and space of Shaoxing city shall prevail)
.
Government invested public building projects with a total floor area of less than 5000 square meters above ground can be implemented as two-star green building projects, while ancillary buildings with a single floor area of less than 1000 square meters above ground can be implemented as one-star green buildings, and renewable energy can not be considered
.
Detailed rules for the implementation of “opinions on accelerating the industrialization development of green buildings and new buildings” issued by Shaoxing housing and Urban Rural Development Bureau (SJJ [2021] No
.
1) in order to better implement the “opinions on accelerating the industrialization development of green buildings and new buildings” (szbf [2021] No
.
Timely establish BIM technology-based construction drawing review, quality and safety supervision, completion acceptance and other aspects of service supervision mode and approval supervision platform
.
The renovation and utilization projects of ancient buildings in ancient cities, ancient towns, ancient villages and ancient streets should fully draw on the wisdom of traditional human settlements, pay attention to the use of traditional building materials and technologies, and maintain a harmonious ecological environment of the block
.
For the projects that are difficult to meet the requirements of Zhejiang Province’s evaluation standard for prefabricated buildings due to special reasons, they should be implemented according to the relevant provisions of the notice on printing and Distributing Some Regulations on organizing expert consultation meetings for special cases of prefabricated building projects (Shaoxing construction [2020] No
.
For special reasons, it is necessary to determine whether the prefabricated building project meets the requirements of Zhejiang Province “evaluation standard for prefabricated buildings”, which should be implemented in accordance with the relevant provisions of “Several Provisions on the identification of prefabricated buildings involving policy incentives in Shaoxing City” (Shaoxing Construction Development Office (2019) No
.
Residential district projects with a total floor area of less than 10000 square meters above ground can be implemented as one star green building projects, while ancillary buildings with a single floor area of less than 1000 square meters above ground can be implemented as one star green building projects
.
Article 4 (planning and design conditions) for the prefabricated civil construction projects, the control requirements of the planning and design conditions are unified as follows: “green building, prefabricated building, steel structure prefabricated house, residential full decoration related contents and requirements, in accordance with the” Implementation Opinions on accelerating the industrialization development of green building and new building “and” Shaoxing City ” The relevant requirements of the special plan for green building (2017-2025) shall be implemented (this clause shall be interpreted and supervised by the competent department of the relevant industry) “
.
Article 2 (implementation of prefabricated buildings) from January 27, 2021, among the new projects that need to be implemented in accordance with the regulations, the projects with a total ground floor area of no more than 6000 square meters (including public buildings, residential buildings and industrial buildings), or the independent supporting buildings with a total ground floor area of no more than 1000 square meters (such as power distribution room, water pump room, garbage collection room) in the construction projects It is up to the construction unit to decide whether to implement the prefabricated construction
.
Article 5 (project identification) civil construction projects with prefabricated construction as required shall be checked by the drawing review organization at the drawing review stage, and supervised and managed by the engineering quality supervision organization at the construction stage and the completion acceptance stage
.
Article 6 (Application of BIM Technology) establish a database of BIM consulting experts at the municipal level, and improve the system of application documents such as planning, survey, design, component production, construction, operation and maintenance, and bidding and contract demonstration texts
.
The real estate management department should strengthen the standardized management of the real estate market, strengthen the primary responsibility of the real estate enterprises, implement the system of entity delivery model house, the entity delivery model house should be built and displayed before the pre-sale, and strengthen the evaluation, notarization and implementation process management of the decoration price of the entity delivery model house
.
In the form of public transfer of urban residential land (ordinary commercial housing), the new commercial housing projects invested and constructed by state-owned enterprises implement the same steel structure prefabricated construction policy requirements as private enterprises
.
The renovation projects of ancient buildings, historical blocks and wooden structures can not be implemented as green buildings; the renovation projects of single buildings on the ground should not exceed 1000 square meters The project or the antique building project with no more than 2 floors can be implemented as one star green building
.
In addition to the new residential projects invested by the government or mainly invested by the government, the newly-built commercial residential projects with a total construction area of more than 100000 square meters on the land transferred or allocated in the central urban area of the city or county shall be constructed with steel structure prefabricated houses of no less than 20000 square meters
.
Article 1 (implementation of green building) from January 27, 2021, except for the following special projects, the new construction projects in the city shall be implemented according to the relevant requirements of the green building special planning: municipal facilities, landscaping, landscape transformation and upgrading and other construction projects
.
All counties and cities should give priority to the new projects on the land transferred or allocated in the central urban area of the region as the implementation objects of prefabricated construction
.
The project division is based on the transfer or allocation of land, and all single buildings of the same transfer or allocation of land are one project
.
For the construction projects located in the plain river network area, with the conditions of direct drainage channel after being treated according to the requirements of sponge City, the total planning land area is less than 20000 square meters, and the annual total runoff control rate is more than 55%, it can be considered as the green building index score without setting rainwater storage tank
.
Pure underground parking project can be implemented as one star green building
.
2)
.
The newly-built prefabricated buildings should meet the requirements of Zhejiang Province’s evaluation standard for prefabricated buildings
.
42)
.
Article 3 (implementation of full decoration) according to the spirit of the “Supplementary Notice of Zhejiang Provincial Department of housing and urban rural development on further improving the full decoration of residential buildings”, from January 27, 2021, in the new projects that need to be fully decorated according to the regulations, the non-public areas of resettlement housing, 4-storey and below residential buildings and public buildings that are not determined to use functions and users are not identified by the government It is up to the construction unit to decide whether to adopt full decoration
.
The project quality supervision organization should strengthen the strength of the construction quality supervision personnel, innovate the supervision means, and promote the implementation of the quality insurance system and the information service supervision platform
.