On December 17, Zunyi Emergency Management Bureau released the investigation report on the “1.14” major collapse accident at the Qilong Xiangshan Meiyu construction site in Xishui County.

When encountering a single technical problem, I also pull a group to discuss it, The Ministry of commerce also came to join the fun…

Violating capital construction procedures and directing workers to work at risk..

At about 11:10 on January 14, 2021, a slope collapse accident occurred at Qilong Xiangshan Meiyu construction site, Shanwang street, Xishui County, killing three people and injuring one person successively.

Chen, male, 28, is the project leader of the construction unit, holding class II Constructor Certificate and safety B certificate.

As an emergency rescue project, no corresponding emergency rescue plan was specified, and the safety control on the construction site was seriously inadequate.

The slope construction unit (1) informed unqualified and professional personnel to investigate potential safety hazards during shutdown, resulting in unauthorized construction and accidents.

It is suggested that there are 3 persons to be investigated for criminal responsibility.

He only informed the workers who did not have the qualification and ability to investigate the hidden dangers by telephone, and was investigated for criminal responsibility.

The project director of the construction unit only asked the slope construction party to treat the slope in the wechat work group, but failed to organize qualified units to investigate the accident slope and formulate construction drawings, and was investigated for criminal responsibility.

It’s not easy to rest.

When the leaders are interested, there will be a work arrangement for the next day, @ everyone replied that it is clearly a project construction project that stresses procedures and processes.

1.

Field measurement shows that the trailing edge of the collapse area is 15.0m long, the average collapse width is about 17m, the collapse direction is 5 °, the collapse length is 7.0m, the average collapse thickness is about 4.0m, and the total collapse volume is about 476.0m ³。 Direct cause the construction unit did not pay attention to the insufficient prediction of the combined characteristic factors such as adverse slope rate, fragile geological environmental conditions and snow melting under extreme climate conditions.

They orally asked to stop the construction.

(2) The safety and technical personnel of the construction party were absent from the construction site for a long time.

Indirect cause 1 The owner (1) the company failed to implement the supervision and supervision instructions in place.

The construction can be carried out only after the construction drawing design and special construction scheme are improved.

AI instructed Jiangshan’s leaders in wechat group and suggested to take a look at the following accident cases.

Click one at random, and a whole column of long “received” and “received” had to scratch up to see what they received.

In short, when things happen, first pull a wechat group to “calm down”.

I’m embarrassed to say that I am engaged in engineering.

(2) If the project construction personnel are not allocated according to the regulations, the safety and technical personnel of the project department will not be on duty after August 30, 2020.

On the same day, the supervisor issued the supervision notice , it is required to suspend the construction of accident slope.

The constructors who command and operate at risk in violation of regulations and command the workers to control the hidden dangers of the slope without the permission of the project Department of the slope construction party shall be investigated for criminal responsibility.

Why is the prohibition order issued and can not be used as a reason for exemption after the accident? Obviously, the subcontractor didn’t listen to the command.

In violation of the basic procedures of engineering construction and without organizing qualified units to conduct on-site investigation and design of the accident slope, risk organizing the slope construction party to enter the site for construction.

If something goes wrong, just say “you turn over the chat records, I informed you in the wechat group”, and pick it up.

3.

On December 15, 2020, the personnel of the on-site supervision team of Xishui housing and Urban Rural Development Bureau visited the project and found that there were no construction drawings and special construction schemes for the construction of the accident slope.

Without the permission of the project Department of the slope construction party, the constructor yuan Moupan arbitrarily commanded the workers to carry out reinforcement mesh binding on the accident slope, commanded in violation of regulations and operated at risk, resulting in the accident.

It’s time to remind.

In violation of the requirements of the labor contract, the labor service unit did not send personnel with safety management qualification to the site to lead the shift.

Wechat group has also become a “battlefield” for all departments to prevaricate.

On the day of the accident, the project leader left the construction site without taking measures to ensure safety.

2.

At present, there are no thirty or fifty wechat groups in a project.

A lot of work wechat groups in the mobile phone lined up the home page.

If it’s time to send a document for signing, it won’t be sent.

However, the company has not attracted attention and has not entrusted qualified units to conduct on-site investigation and design of accident slope.

4.

Only one constructor yuan Moupan was arranged to be responsible for the construction of the project, and the other workers were contacted by yuan Moupan to carry out the construction.

There are several groups within the project department, several labor teams, several design, progress and quality groups of Party A, several supervision groups, and several disobedient teams and groups to focus on firepower alone.

The supervision unit issued the supervision shutdown instruction on December 15, 2020 and reported the relevant situation to the Xishui housing and Urban Rural Development Bureau through the wechat work group, but there are no further measures to urge the construction party to deal with and eliminate the hidden dangers in time.

Key points: there is no construction drawing and special construction scheme for accident slope construction; The personnel of the on-site supervision team of Xishui County Housing and Urban Rural Development Bureau orally asked to stop the construction after they found it during the inspection; The project director of the supervision unit issued the supervision shutdown instruction and reported the relevant situation to Xishui housing and Urban Rural Development Bureau through wechat working group, but there were no further measures to urge the construction party to deal with and eliminate hidden dangers in time.

The construction site will be closed on the day of the accident Safety supervision is not in place.

If no substantive measures are taken to prevent accidents, the responsible person’s dereliction of duty can not be exempted.