[jianjiantong] supervisor, don’t be careless about epidemic prevention! Please keep this site epidemic prevention guide!


Strictly review the special prevention and control plan of the construction company, especially pay attention to whether the prevention and control measures are implemented and whether the emergency response plan is complete, so as to eliminate risks from the source; 2.

Anyone with fever, dry cough and other symptoms shall be prohibited from entering, and shall be reported and handled properly in time.

Reserve materials for a certain period, especially necessary materials such as masks, disinfectants and alcohol as epidemic prevention consumables.

Through holding a special meeting to mobilize all staff for prevention and control, and using the publicity platforms such as site billboards and wechat groups, timely release the epidemic dynamics, relevant work requirements of relevant departments and daily protection knowledge, so as to effectively improve the personnel’s awareness of safety responsibility and normalized prevention and control, and create a positive atmosphere for all staff participation.

Third, ensure that prevention and control materials are always available.

Strengthen the management and control of site personnel.

3.

The supervision unit is responsible for reviewing the work plan for normalization prevention and control of epidemic situation on the construction site, carrying out inspection and putting forward suggestions.

All participating units (including construction, construction, supervision, etc.) shall formulate the epidemic situation normalization prevention and control work plan of the project in combination with the actual situation of the project, establish and improve the work system and organization, clarify the responsible department and person for epidemic situation prevention and control, set up full-time epidemic situation prevention and control posts, and improve the epidemic situation prevention and control management system.

It is required to achieve “four uniformity”: (1) check and register all incoming and outgoing personnel and vehicles; (2) The body temperature of all personnel in and out must be measured, and those with fever, cough and other symptoms are strictly prohibited from entering; (3) Pay special attention to the personnel who have been to and from the epidemic area, prohibit personnel from going to the epidemic area on business trip, and minimize personnel mobility (IV) stop work immediately in case of suspected cases, report to relevant departments in time and handle them properly.

Jianzhoutong media ID: jianzhong001 recently, a new round of epidemic situation in many provinces and cities across the country has begun to counterattack.

Strengthen the epidemic prevention of food, drink and daily life of personnel on the construction site.

First, prepare the work plan in advance.

Second, enhance the prevention and control awareness of the whole staff.

5.

3 personnel management 3.1 health management 3.1.1 strictly implement the personnel management and control requirements of the project location, verify the identity and health information of project personnel by relying on information means such as the national integrated government service platform and the real name management system of construction site, and do not recruit and hire privately, and do not use casual workers and labor personnel without health information, It is not allowed to deploy and use labor personnel unorganized between projects, and it is not allowed to use labor personnel who need to be isolated and observed according to relevant regulations.

4.

3.1.2 the project department shall carry out health management for all personnel employed by all parties involved in the construction according to the requirements of epidemic prevention and control, establish a “one person, one file” system, and accurately grasp the health and mobility of personnel.

Guide for novel coronavirus pneumonia novel coronavirus pneumonia novel coronavirus pneumonia in construction site, Ministry of housing, guide for building new prevention and control of pneumonia in housing construction and municipal infrastructure projects 1 General 1.1, to implement thoroughly the decision and deployment of CPC Central Committee and State Council on the prevention and control of epidemic situation of new crown and lung disease.

In addition, prepare monitoring and washing materials such as forehead temperature gun and hand sanitizer.

The novel coronavirus pneumonia prevention and control strategy is implemented in a comprehensive manner, and the prevention and control of epidemic situation in housing construction and municipal infrastructure projects are done scientifically and orderly.

3.2 personnel access 3.2.1 set up temperature monitoring points at the entrance of the construction site to detect the temperature and check the “Health Code” of all personnel entering the construction site, and check their identity and health status.

The project leader of construction, construction and supervision is the first person responsible for the normalization prevention and control of epidemic situation and quality safety of the unit project.

The majority of supervision units should earnestly raise their vigilance, make plans, prepare, implement and nip in the bud.

Refer to the epidemic prevention guidelines and work requirements issued by relevant departments, carefully draft the special plan for epidemic prevention and control in winter, construction scheme and other documents in combination with their own reality, and require the project under construction to establish a special epidemic prevention and control leading group, refine and implement the responsibilities to each post and person, so as to be targeted.

Implement the normal management of prevention and control on the construction site.

All parties should perform their respective duties, strengthen cooperation, and earnestly fulfill the main responsibility for epidemic prevention and control and quality and safety.

Implement the access registration system and allocate special control personnel; Effective sealing measures shall be taken for entrances and exits that are not needed for use temporarily; Strengthen the enclosure setting of the construction site and keep it effectively isolated from the personnel living area as far as possible.

Once suspected cases are found, they shall be sent to hospital in time, investigated and reported in time according to procedures.

3.2.2 if external personnel really need to enter the construction site temporarily, the project department shall designate a special person to connect..

Trapezoid Rubber Magnetic Chamfer

The general contractor shall be responsible for the organization and implementation of the normalization prevention and control of epidemic situation on the construction site.

2 construction of prevention and Control System 2.1 establishment of epidemic situation normalization prevention and control system.

Novel coronavirus pneumonia is a common guideline for the prevention and control of pneumonia in the new building.

An isolation room shall be set up.

1.2 1.3 under the unified leadership of the local Party committee and government, the local competent housing and urban rural construction departments and relevant departments at all levels shall adhere to the principles of prevention first, scientific management and accurate prevention and control, strictly implement the industrial supervision responsibilities, practically strengthen the guidance on the normalized prevention and control of epidemic situation on the construction site, and urge all parties involved in the construction to strictly implement various prevention and control measures, Ensure the normalization of epidemic prevention and control in place.

The construction unit is the general leader of epidemic normalization prevention and control of the project, and is responsible for the command, coordination and guarantee of epidemic normalization prevention and control on the construction site.

Fourth, do a good job in on-site epidemic prevention and control.

1.

2.2 strengthen the main responsibility of epidemic normalization prevention and control of all parties involved in the construction.

Keep the living area clean and sanitized regularly; Restaurants must purchase food materials from formal channels to avoid centralized dining; All kinds of garbage shall be collected, stored by category and cleared and transported in time.

According to the joint guidance and prevention mechanism of the State Council, the guidelines for the normalization prevention and control of new crown pneumonia epidemic situation are formulated in conjunction with the actual construction industry.