Strictly implement the “should be tested and tested” of nucleic acid testing for all staff, and promote the “should be received and received” of vaccination for all staff at the first time; In the interval of nucleic acid testing, antigen testing is used as a supplementary screening method to further improve the screening rate of construction sites.
4.
The construction site shall strictly control the entrance.
In principle, only one entrance and exit is reserved for each independent area.
All migrant workers in Jiangning implemented the “3+11” management measures and made self declaration in the “report of arriving personnel” module of the “my Jiangning” app in a timely manner.
Nanjing Jiangning District covid-19, 2022, joint prevention and control headquarters..
3.
For the requirements of the travel with an asterisk, the nucleic acid negative certificate within 48 hours shall be provided.
If it is impossible to arrange isolation and monitoring outside, arrange to live and eat alone in the construction site in the first three days, do not arrange work, and do not have close contact with other personnel, and conduct nucleic acid testing once in the first, second, third, fourth, fifth, sixth, seventh, tenth and fourteenth days respectively.
From now on, the construction site will not arrange new staff in principle.
If red code, yellow code, close contact and secondary close contact personnel are found on the construction site, they should immediately report to the local community and the project supervision department, and implement measures such as personnel isolation and transportation, site disinfection, nucleic acid detection, etc.
For all personnel entering the site, the “two yards” of the personnel entering the site shall be checked one by one, the body temperature shall be tested, and the information registration shall be carried out.
10.
3、 Emergency disposal 9.
Independent areas such as the main entrance and exit of the construction site and the dormitory shall be set with inspection and registration points (doorposts) and emergency isolation points, which shall be relatively independent.
“Five immediacies” shall be achieved in case of outbreak of epidemic on the construction site, namely, immediate report (report to the District CDC, community and engineering supervision department), immediate closure (all personnel shall not enter and leave), immediate isolation (isolate the abnormal personnel from the dormitory personnel and the operating personnel of the same team), immediate shutdown (implement partial shutdown of the construction process of the team under the condition of ensuring safety) Disinfect immediately (disinfect the activity places and articles of abnormal personnel under the guidance of the disease control department).
2、 Personnel management 5.
7.
The construction site implements the closed-loop management of “construction site canteen dormitory”.
The canteen and the canteen shall assign special personnel to be responsible for purchasing outside; If the food materials used in the canteen on the construction site are delivered externally, the supplier must be required to arrange fixed personnel to deliver the goods, and the health monitoring and registration of the delivery personnel must be done well.
The canteen at the construction site adopts the serving of individual dishes, and it is not allowed to have meals together; Organize personnel to take meals at different times, and set “one meter line” on the ground.
6.
8.
according to the requirements of the community.
1、 Site management 1.
If the dormitory is set separately from the construction site, the workers should arrange the team leader to lead the team to and from work, and they are not allowed to go out without special reasons.
2.
Commuters on construction sites should implement the “construction site home” two front lines to reduce contact with other personnel.
The construction site implements closed management.