[project cost] construction project contractor clearing price (revised in 2022), for reference~


Therefore, the converted house price is 525-1500 yuan / m2.

Design cost (including the cost during the preliminary design concept): 15 ~ 100 yuan / m2; Supervision fee: 3 ~ 30 yuan / m2; Advertising, planning and sales agency fees: generally 30-200 yuan / m2, and the higher can be more than 500 yuan / m2; Land cost: generally, the urban area (old suburban area) of the second tier cities is 700000-1000000 / mu, and the plot ratio is generally 1.0-2.0.

The central area of the urban area is generally 2 million yuan / mu, and the converted house price is 1500-3000 yuan / m2.

The general cost is about 1150 ~ 2300 yuan / m2, and the high-end community can reach more than 3500 yuan.

If you have any amendments or different opinions, please leave a message in the comment area for peer discussion and reference.

The cost is 250 ~ 580 yuan / m2, generally 180 ~ 490 yuan / m2.

If high-grade aluminum alloy doors and windows are used, it may reach 450 ~ 1100 yuan / m2; Earthwork, entrance door, flue and decoration works of public parts: 35 ~ 180 yuan / m2 (which is closely related to the grade of the community.

The cost of fine decoration is generally 550-1500 yuan / m2, which depends on the grade.

The above does not include the cost of corruption caused by the development of some state-owned enterprises.

Ring Clutch

There are also 300 yuan / m2 simple decoration, and 3000-10000 yuan / m2 super high-grade decoration (bag occupancy).

The general project is about 100 yuan / m2; Labor cost: 145 ~ 220 yuan / m2; Outdoor supporting works: 33 ~ 330 yuan / m2, generally about 75 ~ 110 yuan / m2; Formwork, support and scaffold works (cost): 75 ~ 180 yuan / m2; Tower crane, people and goods elevator, elevator and other construction machinery (about 5 ~ 8% of the total cost): about 65 ~ 98 yuan / m2; Living area, office area, warehouse, road, other temporary facilities on site (water, electricity, sewage, image, production shed and other production rooms): 35 ~ 58 yuan / m2; Inspection, test, formalities, transportation, communication and other expenses: 12 ~ 35 yuan / m2; Contractor’s management fee, data, labor insurance, profit and other expenses (about 10%): sum of the above items * 10% = 95 ~ 190 yuan / m2; Pay various national taxes and fees (3.3 ~ 3.5% of the total cost): 38 ~ 80 yuan / m2, and high-end ones may be as high as 110 yuan / m2.

Thank you for your message correction and sharing! Construction project contractor’s price (the Contractor’s price varies with the market, and the following price is only for your reference.) Formwork: 25-50 yuan / m2 (plastered surface); concrete: 50-55 yuan / M ³ Reinforcement: 650-900 yuan / ton, or 25-42 yuan per square meter for binding; masonry: 95-160 yuan / M ³ Plastering: 12-18 yuan / m2 (excluding door and window openings and scaffold erection and dismantling) face brick pasting: the Contractor’s wall area is 40-50, Floor: 30 yuan / m2 (Revised); indoor floor tile: (600 * 600) 32 yuan / m2; skirting line: 13 yuan / M; indoor wall tile: 32 yuan / m2 (including chamfering); staircase stone: 50 yuan / m2; tread slab edging: 18 yuan / M; gypsum board ceiling: 19 yuan (flat shed); aluminum gusset plate ceiling: 38 yuan / m2; squatting platform partition: 190-380 yuan / rubbing position; large white emulsion paint: 18 yuan / m2; external wall tile: 75 yuan / m2; external wall dry hanging mushroom stone: 95 yuan / m2; roof hanging tile: 46 yuan / m2; Plumbing: 25 yuan / m2 (building area) residential electrical lighting: 30-38 yuan / m2; scaffolder: 18-23 yuan / m2 for general frame erection, 16-22 yuan for climbing frame, excluding drawing changes during construction; 22-38 yuan (actual area) for municipal decoration frame; real estate construction cost (calculated by building m2); pile foundation engineering (if any): 80-120 yuan / m2; Reinforcement: 40 ~ 75kg ㎡ (low multi-layer content and high-rise content), 220 ~ 450 yuan / m2; Concrete: 0.3 ~ 0.5 m3 / m2 (low multi-layer content and high-rise content), equivalent to 120 ~ 185 yuan / m2; Masonry works: 70 ~ 150 yuan / m2 (high multi-storey content and low high-rise content); Plastering works: 28 ~ 45 yuan / m2; Exterior wall works (including thermal insulation): 55 ~ 110 yuan / m2 (based on the standard of general coating, if it is stone or curtain wall, it may be as high as 360 ~ 1200 yuan / m2); indoor water and electricity installation works (including fire protection): 110 ~ 250 yuan / m2 (according to the grade of the community, multi-storey is slightly lower); Roof works: 18 ~ 35 yuan / m2 (high multi-storey content and low high-rise content); Door and window works (excluding entrance doors): the area of doors and windows per square meter of building area is about 0.25 ~ 0.5 ㎡ (which is closely related to the design and whether it is high-grade, and the proportion of high-grade is large).

This article is the latest revised construction project contractor price in 2022, which varies from region to region, for reference only! The actual cleaning and construction price shall be determined according to the drawings, specific conditions and other conditions.

The core area can reach more than 3 million yuan / mu, and the cost of one-way land is higher; First tier cities even have a land cost of more than 20000 yuan per square meter; The cost per square meter of land in third tier cities and county towns is relatively low, generally 100-500 yuan / m2, but also up to more than 2000 yuan / m2; The land tax and preliminary fee are generally about 15% of the land fee, and the second tier cities are generally 100-500 yuan / m2, with different standards in different places..

The above does not include fine decoration.

The higher the grade, the higher the cost); Basement (if any): increase the cost by 45 ~ 120 yuan / m2 (high multi-storey content and low high-rise content); Elevator project (if any): 42 ~ 250 yuan / m2, which is closely related to the grade of the elevator, the number of elevators and the number of floors.

Tags:

Related Post

Implementation Opinions on promoting the synergy between intelligent construction and building industrialization and accelerating theImplementation Opinions on promoting the synergy between intelligent construction and building industrialization and accelerating the

   1、 Background of introduction    (1) Promoting the transformation and upgrading of the construction industry is the inevitable requirement of high-quality development    During the 13th Five Year Plan