Questions and answers about budget quota compilation of construction projects


Specifically, those quota items are allowed to be converted, and how to conduct conversion is specified and explained in detail in the description of each chapter of quota

.

When handling the visa form, you should pay attention to the clear content

.

It’s better to have quantity and items to avoid ambiguity, so as to reduce the disputes caused by different understandings between the two parties

.

Under normal circumstances, the cooperation fee should be 4% of the project cost, and 2% should be borne by the construction unit and the construction unit of doors and windows

.

What is the difference between the fixed price, the guiding price and the fixed price in the budget? A: the budget price in the budget quota refers to the material price included in the material cost in the sub item of the budget quota

.

1

.

Even in the bidding project with the list quotation of the total price contract, the bidder should take this cost into account in the total quotation when preparing the tender offer

.

This situation often occurs when Party A specifies the brand of the product

.

A: in this case, it depends on whether the construction technology needs cooperation

.

~~Recommended reading ~ ~ to be a master of drawing joint review, you must have the basic knowledge of drawing joint review, understand the wall calculation method and precautions, and get started with the project cost quickly! Project visa 9 skills, turn loss into profit! Novice, super detailed pile cap construction process.

.

2

.

How to understand the visa and what problems should be paid attention to when handling the visa form? A: the visa refers to the written information that the construction unit, according to the requirements of the construction unit, requires the construction unit to certify after completing the construction drawings and the projects beyond the construction contract assigned by Party A

.

The pricing is generally a price agreed by both parties, which is used as the material price for project settlement

.

Is it possible to calculate the quantities of reinforced concrete lintels and tie bars embedded according to the specifications for temporary construction openings? Answer: for the construction openings retained according to the reasonable construction organization design (approved by the construction unit and the supervision unit), the costs of temporary lintels and masonry tie bars during construction should be included in the project budget

.

And how the construction contract is signed

.

Budget price is involved in the direct fee collection project

.

For example, in reinforced concrete engineering, when the designed concrete strength grade is different from that given in the quota, the conversion of concrete strength grade should be done

.

5

.

The guiding price generally refers to the market price, which is usually issued by the government cost management department according to the actual price statistics of the building materials market

.

3

.

Which parties are required to sign the design change order? A: under normal circumstances, the design change order should be signed and confirmed by the representatives of the construction unit, the design unit, the supervision unit and the construction unit, and then the change order will come into effect after the chief supervision engineer issues the change order

.

4

.

In fact, the amount of cement, sand and other materials in the quota is adjusted

.

6

.

In this case, the construction cooperation fee should be calculated

.

The guide price is generally used to calculate the material difference, can not participate in the fee

.

Under what circumstances, it is necessary to adjust the material consumption in the quota consumption? Answer: if the practice indicated in the design and construction drawings is different from that of the quota, the content of some quotas can be converted

.

Generally speaking, if it is the production and installation of plastic steel windows and anti-theft doors, and the construction unit contracts separately, it actually needs the main construction unit to provide power supply, vertical transportation and other cooperation

.