Summarize and answer questions about building electrical, impermeable test block, flue inspection records, steel structure capacity and


6.

4.

C30p6 means the former is the strength of the test block, that is, how to retain our compression test block.

Also, we are Ming wiring pipes.

Let’s focus on the 2016 requirements.

3.

The observation frequency is still the design requirements.

If there are requirements in the design, the observation shall be made according to the design requirements.

How to do the civil flue inspection records? Whether to make one on each floor or one building together, what does the date mean? Fill in / A: the inspection record of the flue can be made for the whole building, and the date on schedule is the date of installation completion.

If there are requirements in the drawing description, the initial observation shall be made according to the requirements.

How do we need to report the data for subcontracting a to do the outdoor supporting landscape greening, the installation of air conditioning in the machine room and the ground floor? Does subcontracting a need to report the approval form to the subcontractor like the general contractor, or do we make the commencement data ourselves as an independent unit? But if the supervisor asks us to use the construction form for reporting the subcontracting approval form, we directly use the JJ form for reporting, then we sign and sign the sample Such management materials all use JJ? SN is used for inspection lot and material submission for approval? A: you need to see whether this is what your construction contract stipulates and whether it is included in the construction permit.

Like other non impermeable test blocks, P6 represents the impermeable test block, that is, in addition to the compression test block, a group of impermeable test blocks should be retained.

Are the cast-in-place structures such as cushion, raft and retaining wall used for concealment? Answer: No.

8、 Let me ask you a question.

Generally, such outdoor works are done by themselves and are not included in the general contract.

What is the capacity of the inspection lot of steel structure? Answer: beams and columns are pieces, and slabs are spans.

Is it necessary to indicate that the secondary piping in the electrical part is the secondary piping in the inspection lot? Answer: there is no need to write secondary piping.

5.

2.

1.

How to do deformation observation? Answer: the 2016 deformation specification is more thorough, and the 2021 general specification is less.

Is it OK to measure the data of at least 10 circuits and write them on the same table? Answer: the specification stipulates that 20% of the circuits shall be sampled according to the number of inspection lots, that is, 20% of each inspection lot, that is, at least two circuits…

PVC Chamfer

Now we have a job.

If there are no requirements, the initial observation can be set according to the design requirements after the formwork removal of the wall column on the first floor.

There are few obvious matches now.

9.

Do you want to keep the same condition for impermeability? Answer: you don’t mix the impermeable test block and the compressive test block together.

Insulation resistance test, a total of five layers, each layer of lighting distribution box 10 circuits.

I looked in the inspection lot and found that there is no one in the main control project, all of which are in general projects, right? A: there are specifications and models of materials in the master control.

If there are no requirements in the design, once for each floor below the standard floor of the high-rise building, and once for 2-3 floors after the standard floor, Multi storey and row houses are basically one floor at a time.

7.

Tags:

Related Post

Department of Management, New Campus of Zhongyuan University of Science and Technology/Tsinghua University Architectural Design and ResearchDepartment of Management, New Campus of Zhongyuan University of Science and Technology/Tsinghua University Architectural Design and Research

In the “Classification Catalogue of High quality Scientific and Technological Journals in the Field of Building Science (2024)” released by the Chinese Architectural Society, “Contemporary Architecture” was selected and awarded