Summary of “customs clearance” of construction enterprise qualification declaration


In the process of construction enterprise qualification declaration, there are dozens of reasons for the high frequency of “not pass” publicized by the housing and construction department, which are summarized for your reference! 1

.

Performance 1

.

The total calendar days of the construction period shown in the contract are inconsistent with the construction period shown in the letter of acceptance, which is not recognized in case of doubt

.

2

.

The construction period of the project contract, the planned completion time and the actual completion date have a large span

.

If there is doubt, it will not be recognized

.

3

.

The completion date of all achievements is the same as the acceptance date, which is unconventional

.

4

.

In all the achievements, the completion time of the project is completely consistent with the completion time agreed in the contract, and the completion acceptance time is just on the same day, which does not conform to the common sense and reality of domestic project construction

.

If there is doubt, it will not be recognized

.

5

.

The letter of acceptance is earlier than the time of drawing design

.

6

.

The contract of performance engineering has no signing date and is invalid

.

7

.

If the drawing date of the performance drawing is inconsistent with the validity period of the practicing seal, it shall not be recognized in case of doubt

.

8

.

If the construction unit on the design drawing of the performance project is inconsistent with the construction unit on the letter of acceptance, acceptance form and contract, it shall not be recognized

.

9

.

The signature of the person in charge of the project design is inconsistent with that of the construction drawings and the completion acceptance

.

10

.

The project leader of the design unit in the drawing is inconsistent with the project leader of the design unit in the completion report

.

If there is doubt, it will not be recognized

.

11

.

There is no record in the public service platform of national construction market supervision, which is not effective performance and shall not be recognized

.

12

.

If the performance scale does not meet the requirements of qualification standards, it shall not be recognized

.

13

.

The number of performance is not up to standard

.

14

.

The construction area is insufficient

.

15

.

The construction area is inconsistent with the total construction area of the drawing, which is questionable

.

16

.

Performance did not submit the floor plan, area can not be assessed, not identified

.

17

.

Performance beyond the scope of registered professional, not recognized

.

18

.

The performance is beyond the qualification and is not recognized

.

19

.

Performance does not reflect specific indicators, not recognized

.

20

.

The authenticity of the project is in doubt

.

21

.

The special seal for drawing of design drawings and the architect’s personal practice seal are not clear, and the drawings are in doubt and shall not be recognized

.

22

.

The project contractor is not a declaration unit and shall not be recognized

.

23

.

The attached drawings are not standard (incomplete) and shall not be recognized

.

24

.

The design part is not recognized

.

25

.

No drawings are provided in the performance report, which can not reflect the assessment indicators and will not be recognized

.

26

.

The contents of the acceptance conclusion column in the performance completion acceptance certificate are copied in the same edition and shall not be recognized

.

27

.

In all achievements, there is no contract settlement price in the completion acceptance report

.

If there is doubt, it will not be recognized

.

28

.

The performance project settlement audit report is not signed and sealed by the cost personnel, and is not recognized if in doubt

.

29

.

If the performance is not provided with special terms of contract as required, it shall not be recognized

.

30

.

The source of funds for performance engineering projects is financial appropriation, and the project approval number is not shown in the contract

.

31

.

All government invested projects have not been put on the bidding record, so they are not recognized in case of doubt

.

32

.

The letter of acceptance of the performance project clearly indicates that it is a bidding project, but it indicates that it is a non bidding project in the construction contract

.

33

.

The data provided can not prove that the procedures for changing and increasing the storey height during the construction period of the project are in accordance with the law and shall not be recognized

.

34

.

Failure to provide completion acceptance certificate or project trial operation certificate

.

35

.

The audit report of performance engineering is questionable

.

36

.

In the construction contract of performance project, the cost is inconsistent in words and figures, and it is not recognized if in doubt

.

37

.

All the letter of acceptance, project contract and completion acceptance certificate representing the project performance, with the time span from 2009 to 2016, have the same format and are not recognized if in doubt

.

38

.

The signature and seal of the letter of acceptance of the performance project are not clear

.

39

.

The general situation of the project in the completion acceptance report, which represents the performance, is wrong and will not be recognized if in doubt

.

40

.

If the structure type is inconsistent with the architectural design specification, it shall not be recognized in case of doubt

.

2、 The repeated registration of personnel, constructors and other practitioners shall not be recognized

.

42

.

The constructor transfers to the enterprise 6 days before the declaration, which is not recognized

.

43

.

The registered unit of the project manager is not a qualified enterprise

.

44

.

The project manager undertakes the project beyond the scope of practice

.

45

.

The project manager works without certificate, and the constructor’s initial registration time is later than the bid winning time, so it will not be recognized

.

46

.

The project manager is not a member of the unit

.

47

.

The project manager of the performance project does not find the information of the constructor, so it will not be recognized

.

48

.

The name of the personnel in the performance data is inconsistent with that of the inquiry project manager

.

If there is doubt, it shall not be recognized

.

49

.

If the personal performance reported in the application form of the technical director is inconsistent with the performance in the attachment materials, it shall not be recognized in case of doubt

.

50

.

The technical director’s professional and technical management experience is not up to the standard

.

51

.

The signature of the chief supervision engineer in the completion acceptance data is not the same person as the chief supervision engineer in the construction contract

.

52

.

The birth time of the technical director’s graduation certificate is inconsistent with the birth time of the ID card

.

If there is doubt, it will not be recognized

.

53

.

If the technical director fails to provide professional title certificate and identity certificate, it shall not be recognized

.

54

.

The attached materials provided by the financial principal of the enterprise can not reflect that he has the title of senior accountant and the qualification of certified public accountant, and shall not be recognized

.

3、 Other reasons 55

.

The single square cost of the project including pile foundation is only 1000 yuan per square meter, which is seriously inconsistent with the market and doubtful

.

56

.

If the unit cost is too low, it will not be recognized if there is doubt

.

57

.

The drawings are self-made by the company, and are not produced by the design company (Guizhou Architectural Design Institute)

.

Invalid drawings shall not be recognized

.

58

.

The work safety license provided by the applicant shall not be recognized

.

59

.

The net assets of the enterprise do not meet the requirements..

.