Suqian construction qualification transfer purchase


This is particularly important for enterprises with qualified upgrading needs and limited performance quantity and category.

Before the door for supplementary recording of performance is closed, the performance will be recorded according to the policy requirements The key point we emphasize today is to make up a complete record according to the future needs of the enterprise.

Planned cities: Beijing (Beijing), Tianjin (Tianjin), Heilongjiang (HEI), Jilin (Ji), Liaoning (Liao), Hebei (Ji), Henan (Yu) and Shandong (Lu) , Shanxi (Jin), Shaanxi (Shan), Inner Mongolia (Inner Mongolia), Ningxia (ning), Gansu (long, GaN), Xinjiang (Xin), Qinghai (Qing).

Zhaocai cat enterprise processing consulting (Sichuan) Co., Ltd.

Now our business has covered the whole southwest region and promoted to the whole country.

I.

Of course, for some enterprises with “performance deficit” It’s a great opportunity for enterprises with urgent upgrading needs.

We must catch the last bus.

Tibet (Tibet), Hubei (Hubei), Anhui (Anhui), Jiangsu (Jiangsu), Shanghai (Shanghai), Zhejiang (Zhejiang), Fujian (min), Hunan (Hunan), Jiangxi (GAN), Sichuan (Sichuan, Shu), Chongqing (Chongqing) , Guizhou (Guizhou, Guizhou), Yunnan (Yunnan, Yunnan), Guangdong (Guangdong), Guangxi (Guangxi), Hainan (Hainan), Hong Kong (Hong Kong), Macao (Macao) and Taiwan (Taiwan).

  。.

(I) supplementary recording of project information shall be fully recorded into the construction drawing review (including survey and Design) from the application for construction , bidding, contract filing, quality and safety supervision, construction permit, completion filing and other relevant information, and enter the information of project leaders, project teams and other personnel of the seven main bodies of construction, survey, design, construction, supervision, drawing review and testing.

(4) After the supplementary recording of the identified project information is completed, it will generally be publicized on the provincial portal website for 10 working days.

The deadline for supplementary recording of performance in each province is also different.

Don’t wait until the qualification upgrade and find that “curry” has no performance.

Professional contracting qualification for construction: Environmental protection, decoration, electromechanical equipment, building curtain wall, ancient architecture and city And road lighting, electronics and intelligence, fire protection, waterproof, anti-corrosion and thermal insulation, steel structure, formwork and scaffold, foundation, lifting equipment, ready mixed concrete, bridge, tunnel, highway pavement, highway subgrade, highway transportation, railway electricity, railway track laying and girder erection, railway electrification, airport runway, civil aviation air traffic control, airport visual navigation aid, port and coast, waterway Navigable buildings, port and shipping equipment and water traffic management, hydraulic metal structure fabrication and equipment, water conservancy and hydropower electromechanical equipment, river and lake regulation, power transmission and transformation, nuclear engineering, offshore oil and special services.

(5) The specific requirements are different from each province, and the requirements of this province shall prevail.

At that time, it’s really bad every day and shouldn’t be.

Zhaocai cat headquarters is located in Chengdu, Sichuan, a “small Hong Kong” in Southwest China, enjoying the “land of abundance” Reputation.

Lifting Insert

service guide.

At that time, the supplementary recording window will be closed automatically and no supplementary recording application of any enterprise will be accepted.

Com), referred to as zhaocaimao, is a company approved and registered by Suqian Administration for Industry and commerce, providing qualification, qualification handling, qualification agency, qualification transfer of various construction engineering qualifications, handling safety production licenses and providing talent services for construction enterprises (class I and class II constructor, middle and senior engineer, technician certificate, etc.) Enterprise management consulting company, providing efficient resource services for enterprise development.

Tel: 13881983131 zhaocaimao construction wechat: 13881983131 Suqian zhaocaimao Construction Engineering Consulting Co., Ltd.

Subsequently, the housing and construction departments of all provinces have carried out vigorous supplementary recording of performance.

For example, Henan is April 30, 2021, Shandong is June 30, 2021, and Hubei is September 30, 2021.

We should pay attention to this matter from the company’s boss to the person in charge of qualification.

provides you with all-round supply: the latest construction information.

(www.zhaocaimao8.

In August 2016, the Ministry of housing and urban rural development issued a notice since 202 Construction enterprise qualification (including special grade of general construction contracting) approved by our department from January 1, 2001 In October 2016, the Ministry of housing and urban rural development issued another notice to simplify some indicators of the qualification standards for construction enterprises.

At present, there are more than 500 employees, the proportion of professional and technical personnel is more than 60%, and the number of registered technical talents with medium and high-grade technical titles and level-1 or above qualifications ranks among the top in the operation.

General contracting qualification for construction: construction, municipal administration, electric power, electromechanical equipment, highway, railway, port and waterway, water conservancy and hydropower, mining, metallurgical quality, chemical petroleum and communication.

If there is no complaint, the supplementary recording information will be entered into the “integrated working platform” project library for assessment and identification as the effective project performance of the construction enterprise.

We started in Chengdu with Sichuan as the mainland and have been intensively cultivated for more than 10 years.

At the same time, it pointed out that enterprises applying for special and first-class qualifications for general contracting of construction engineering and municipal public works did not enter the “four warehouses and one platform”“ The enterprise performance of (national construction market supervision and integrity information release platform) shall not be regarded as effective performance recognition.

(III) Enterprises within the scope of performance can log in to the provincial construction market supervision and integrity integration platform for supplementary recording of performance within the administrative region of the province; performance outside the province shall be entered into the national construction market supervision and integrity information release platform at the province, city and county where the project is located.

(II) the time limit for supplementary recording of performance shall be in accordance with the qualification standard for construction enterprises It is required that the enterprise can report the general contracting performance of housing construction projects in the previous five years (January 1, 2011 – January 1, 2016) and the general contracting performance of municipal public works in the previous ten years (January 1, 2006 – January 1, 2016).

Tags:

Related Post