Technical Regulations for Preparation of Construction Drawing Design Documents of Chongqing Construction Engineering (Version 2022)


It does not mean that this official account agrees with his opinion or verifies the authenticity of his content, such as other media, networks or individuals from this official account
.

Erection Anchor One Sided

The content is the author’s personal opinion, which is only for reference.

→ Summary of key points of construction drawing review in all provinces and cities “2022.12.27 update” Previous summary ● Summary of key points of construction drawing review in all provinces and cities “2022.12.27 update” ● Fire separation between electric bicycle parking lots, parking sheds and other buildings ● Can common elevators be installed in shared front rooms, expanded front rooms and expanded enclosed staircases? ● Can monorail steel fire shutter be set on the garage lane? ● Selection and countermeasures of normally-closed and normally-open fire doors in design ● How to understand “directly to the outside” in the Code for Fire Protection Design of Buildings? ● Minutes of a seminar on fire control problems ● Requirements for fire doors in “fire pump room” and “fire control room” ● Summary of common problems in fire control acceptance ● Detailed explanation of the difference between the net area and the use area of the Building Code ● Summary of the answers of the Ministry of Housing and Urban-Rural Development in the field of fire protection ● Summary of the implementation rules of “continuous updating” of sponge cities in various provinces and cities ● How to calculate the height of fire buildings? ● “2022.01.12 Update” Summary of common problems about the use of glass partition in the evacuation walkway ● Summary of 6.6.4 of the Building Code on the requirements for corridor setting ● Summary of the Building Code on the plane layout ● Summary of 3.3.5 of the Building Code on issues related to the office in the plant ● Summary of technical measures taken to prevent flooding in the fire pump room and fire control room ● Can offices, apartments and hotels share the core tube evacuation stairs? ● Summary of common problems with partition walls in evacuation walkways ● An administrative proposal at the end of 2021 – about the setting of outdoor evacuation stairs ● Arrangement of the setting positions of window sill walls ● Can doors, windows and openings be opened on the firewalls between Class C warehouses? Is there any requirement for opening size when opening is allowed? ● Summary of the requirements for the setting of protective cornices ● Does the front room of the fire elevator need to meet the short side of 2.4 meters at all positions? ● How to remember the fire separation between the factory building and the warehouse? ● Summary of fire separation in various places ● Disclaimer of key points for review of construction drawings The documents/drawings and other contributions contained and shared in this official account are for the purpose of disseminating useful information for the public.

Tags:

Related Post

Four schools of finance, five colleges and four departments, two e-mails and one mail, old eight schools of construction… How manyFour schools of finance, five colleges and four departments, two e-mails and one mail, old eight schools of construction… How many

8. Six star University of Finance and economics, Central University of Finance and economics, Shanghai University of Finance and economics, University of international business and economics, Southwest University of Finance

[Daily Q&A, Xinyang tax language can help you solve your problems] How to pay VAT when renting construction equipment and equipping[Daily Q&A, Xinyang tax language can help you solve your problems] How to pay VAT when renting construction equipment and equipping

Xinyang Accounting makes your finance and taxation worry free and makes the enterprise trustworthy! Hebei Xinyang Accounting Consulting Service Co., Ltd. Please pay attention to the hotline 0317-8885178/5335518 to institutionalize