In a short period of six months, the project was initiated within the year and started within the year
.
The scientific and compact overall layout of the regional medical center is located in the central area of Jing’an, and the surrounding residents live in high density
.
It will build a regional medical center with the level of three-level comprehensive hospital integrating emergency, outpatient, medical technology, ward, physical examination, rehabilitation, public health, scientific research and teaching
.
The construction of major first aid projects, including stroke center and chest pain center, will be further strengthened, so that the regional aging diseases and acute attack of chronic diseases can be better treated
.
The community public service center is set on the north side according to the planning requirements
.
After the energy center of the new project is put into operation and the existing large-scale medical equipment is moved in place, the current medical technology room will be demolished, and the basement will be excavated, which will be seamlessly connected with the basement built in the earlier stage and the basement of the original hospital area, so as to realize the function upgrading of the hospital Steady transition
.
The high-rise buildings of the medical complex are distributed in the south side, and the way of falling layer by layer is adopted in the north side, which effectively avoids the sunshine shielding of the surrounding houses and schools
.
In the East is the former Zhabei District Central Hospital, in the north is Shanghai private Yangbo middle school and residential district, in the west is Datong Road, and between Datong Road and Datong Road is urban public green space
.
The base is located in the central city of Shanghai
.
The four floors above the ground of the comprehensive three-dimensional transportation are equipped with overhead corridors to connect the three new buildings in series
.
Ensure that the old hospital area can be used normally in the construction process of the expanded hospital area, and meet the efficient connection in the future; 3
.
The sunken courtyard is set on the north side of the square to improve the lighting and ventilation conditions of the basement and create rich three-dimensional greening
.
The new high-rise medical complex building is located at the intersection of urban roads, so the corner of the building is softened, which is not particularly friendly to the city streets, but also reduces the shading of the residential sunshine on the north side
.
The renovation and expansion project of Shanghai Jing’an District Medical Center won the bid by Tongli Architectural Design Institute of Tongji Design Group officially started on January 4
.
The science and education administration building is arranged on the north side
.
At the same time, the project makes full use of the vertical facade, roof garden and corridor space of the building to set up ecological greening for the hospital space with tight floor area, improve the ecological environment of the hospital, increase the vitality of the hospital, adjust the environmental atmosphere of the hospital, and create a green medical center with the characteristics of the times
.
At the same time, the four to six floors of the medical complex building are equipped with air corridors to organically connect the new project with the original outpatient and medical technology complex building according to the needs of functional layout
.
The project creates favorable conditions for optimizing the overall medical process of the hospital by establishing an efficient and convenient transportation system
.
As the building on one side of the main facade of the new building is close to the existing outpatient and inpatient building, the main square of the entrance of the new medical complex building and the existing building in the old hospital area is used as the main entrance of the hospital
.
Some of the pictures in this article are from the Internet, and the copyright belongs to the original author and source
.
Meet the demarcation and layout requirements of surrounding residential buildings and public green space Sunshine requirement
.
Source: Tongji design tjad (ID: tjad News) project highlights the renovation and expansion of the medical center, which is a landmark project in the health “fourteenth five year plan” of Jing’an District, and is of great significance to the medical and health supply of the whole district and the improvement of medical service level
.
The north side of the medical complex building is the public health center
.
The project will make full use of advanced technologies such as “Internet plus medical health”, artificial intelligence, big data and cloud computing, so as to enhance the level of diagnosis and treatment of clinical subjects that are most closely related to the people’s health, and better serve the health of the people in the region
.
The functions of the outpatient and emergency area, medical technology area, inpatient area, administrative logistics area and scientific research office area are clear and interconnected, creating a good environment for medical treatment and rest
.
The new expansion area of the project is 22954.6 square meters, the new construction area is 102973.02 square meters, the reconstruction construction area is 478 square meters, and 309 new beds are added
.
If it involves infringement or the owner of the original right does not agree
.
The project was started in June 2020
.
In the project, the clinical public health center is added to fill the vacancy of the regional public health prevention system, and the emergency level will be further improved
.
Fully consider the relationship between the old and new hospital areas and the coordination and distribution of the overall functions of the expanded backyard area, especially the re arrangement and arrangement of public medical equipment and support system; 2
.
The shape of the plot is irregular
.
The tense land use and complex surrounding environment provide multiple materials for the design, which not only solve the pain point, but also stimulate the creative power
.
The building layout is scientific and reasonable, in line with the hospital design criteria
.
Vivid architectural image: the architectural design extracts the material interface based on warm gray stone, and adopts the facade modeling based on horizontal lines, so as to realize the integrity and continuity of the architectural style of the courtyard
.
The relatively consistent facade elements combined with the scattered building volume form a dynamic and harmonious building group image
.
Under Datong Road is Metro Line 1
.
Firstly, the energy equipment room on the west side of the hospital area will be relocated, and then a new project will be built on the west side of the existing hospital area
.
At the same time, the new basement and the original basement of the medical technology building are equipped with underground passages to meet the needs of multiple flow lines
.
There are independent entrances and exits in different functional areas
.
In order to ensure the normal operation of the original hospital area during the project construction and make the best use of the valuable land resources, the gradual evolution implementation scheme is adopted after joint planning with the hospital
.
The main focus issues of the project include: 1
.