Among them, the core area of the hub includes T3 terminal, Ningbo West Station (including parking lot), Comprehensive Transportation Transfer Center (GTC), the upper cover of the hub, access roads, parking lots, etc; The underground space of the hub (including the underground space of the rail transit station design and the connecting building) and the land area of other supporting buildings.
Contact information: Proposal solicitation agency: Ningbo International Investment Consulting Co., Ltd.
It will take the modern multi-modal integrated transport hub as the core carrier, create a new platform for the allocation of international regional high-energy comprehensive resource elements, a new engine for the upgrading of the value chain of the industrial cluster around Hangzhou Bay, and an international aviation metropolis integrating industry and city in Ningbo in the new era, forming a new power source for the south wing of the Yangtze River Delta to participate in the international and domestic double cycle.
We sincerely invite well-known design teams at home and abroad to participate in this scheme solicitation.
It is a leading traction project for Ningbo to reshape urban space, improve urban functions, optimize urban quality, and improve urban energy levels.
Attention! Traffic control in these sections of Ningbo 3.
According to the work deployment of Ningbo Railway and West Hub Construction Center, the conceptual scheme solicitation for the main buildings of Ningbo West Hub was officially launched (hereinafter referred to as the scheme solicitation).
2.
Schematic Diagram of Solicitation Scope Solicitation Time and Bonus 1.
Let’s take a look ↓ Project background Ningbo West Hub Area is bounded by the planned expressway, expressway, trunk road and other backbone roads, with a total area of 108.3 square kilometers.
The hub body design requires to take the construction of the hub of “air rail integration” and “station city integration” as the goal, efficiently aggregate various large capacity and large-scale transportation resources, integrate multiple commercial formats, multi-dimensional transfer, urban parks, creative ideas and other places, and create a “Ningbo First Landmark” with complete functions, space integration and beautiful style.
1.
The design cycle in the scheme preparation stage is about 3 months (including holidays), and the selected scheme is determined after two rounds of review.
Ningbo opens the fifth navigation right! Authoritative release of the new “Ningbo Airport Station” of “Transnational Public Transport”, quick attention to people’s livelihood services ↓ Source: Ningbo International Investment Consulting Co., Ltd., Ningbo Railway and West Hub Construction Center, Trainee Editor: Zhang Yiyi, Reviewer: Wang Xinzi, Dai Qiaoze, Zheng Zhongye, Zhang Weifang..
Contact person: Xin Bingming Email: 13738431077@163.com Website: www.nbgodo.com You are still watching.
Bonus Setting The total bonus pool set up in this scheme is 21.5 million yuan (tax included), of which the first prize is 8.5 million yuan (tax included), the second and third prize are 3.5 million yuan (tax included), and the fourth to sixth prize are 2 million yuan (tax included).
The scope and design requirements of the scheme solicitation for the location sketch map of the West Hub in the spatial structure of Ningbo City will focus on the conceptual scheme design of the hub’s main building, which is divided into the hub core area and the coordination and linkage area.
Time Schedule The prequalification announcement for this scheme solicitation has been officially launched on China’s public service platform for bidding and tendering on October 31, 2022( http://www.cebpubservice.com/ )It was released, and the prequalification was planned to be conducted on November 20, and six shortlisted applicants were selected to enter the scheme preparation stage.
It is a major hub for Ningbo to build from a high starting point and a high standard, and a century project to build with high level and efficiency.
Ningbo West Hub is a major hub project serving Ningbo, the whole province, the Yangtze River Delta, and the national strategy.
From November 9 to 11, the “Zhejiang” international event is waiting for you! 2.
The scope of the coordination and linkage area includes the terminal area, flight area, working area and other areas south of runway 2 in the south of the airport and the first urban interface area in front of the high-speed railway station.