The construction engineering director, special supervisor and supervisor carefully read these 50 contents and won 20 specifications


Safety permit acceptance procedures for construction machinery and facilities; 4.

Contents of laboratory inspection of the construction unit: 1.

Construction organization design and special construction scheme.

Review the construction survey and setting out results submitted by the construction unit.

If the professional supervision engineer finds one of the circumstances, he shall timely notify the chief supervision engineer to issue a project suspension order? 1.

Safety production license of the construction unit, qualification certificate of project manager of the construction unit, work license of full-time safety production management personnel and operation license of special operation personnel; 3.

11.

What should be checked and rechecked for the construction control survey results and protection measures submitted by the construction unit? 1.

12.

9.

Collect data related to the claim; 3.

Qualification level and test scope of the laboratory; 2.

Business license and enterprise qualification grade certificate; 2.

Elephant Foot Ferrule

6 review the emergency plan for production safety accidents in the construction organization design, focusing on the emergency organization system, responsibilities of relevant personnel, early warning and prevention system and emergency rescue measures Construction scheme: 1.

What conditions should be met for the commencement of the project? 1.

Main contents of supervision implementation rules: 1.

3.

Accept the cost claim review form submitted by the construction unit within the time limit agreed in the construction contract; 4.

5.

The construction unit constructs without approval; 2.

6.

The on-site quality and safety production management system of the construction unit has been established, the management and construction personnel have been in place, the construction machinery has the use conditions, and the main engineering materials have been implemented; 4.

10.

Preparation basis of supervision implementation rules: 1 supervision planning; 2.

Project cost control; 7.

Key points of supervision; 4 supervision methods and measures.

Regularly patrol and inspect the construction operation of divisional and subdivisional works with high risk.

Supervision organization form, staffing, mobilization and demobilization plan, and post responsibilities of supervisors; 5.

Compilation and review procedures shall comply with relevant regulations; 2.

Project progress control; 8 contract and information management; 9.

Procedures for the project supervision organization to deal with the cost claim of the construction unit? 1.

The construction unit fails to construct according to the approved construction organization design or violates the mandatory standards for project construction; 4.

Establishment and implementation of on-site safety production rules and regulations of the construction unit; 2.

Relevant standards and engineering design documents; 3.

The construction schedule shall meet the construction conditions provided by the owner (funds, construction drawings, construction sites, materials, etc.).

Whether special operation personnel work with certificates.

Project quality control; 6.

Supervision basis; 4.

The arrangement of construction sequence shall meet the requirements of construction technology; 4.

Scope, contents and objectives of supervision work; 3.

What are the basic contents of subcontractor qualification review? 1.

After reaching an agreement with the construction unit and the construction unit, issue the expense claim review form within the time limit agreed in the construction contract and submit it to the construction unit..

If the construction unit needs to further submit detailed information, it shall issue a notice within the time limit agreed in the construction contract; 5.

Organization and coordination; 10 safety production management responsibilities; 11 supervision system; 12 supervision facilities.

The metrological verification certificate issued by the legal metrological department for the test equipment; 3 laboratory management system; 4.

3.

Accept the notice of intention of cost claim submitted by the construction unit within the time limit agreed in the construction contract; 2.

Safety production license documents; 3.

What are the basic contents of construction schedule review? 1.

Design disclosure and drawing joint review have been completed; 2.

Whether the construction site management personnel, especially the construction quality management personnel, are in place; 4.

Characteristics of professional engineering; 2.

What should the project supervision organization focus on checking the construction unit in terms of safety? 1.

There are major potential quality accidents or quality accidents in the construction.

Basic contents of construction organization design and review of special construction scheme construction organization design: 1.

Main contents of supervision planning 1 project overview; 2.

There is no omission of main engineering items in the construction schedule, which shall meet the needs of batch use or supporting use, and the phased construction schedule shall meet the requirements of the overall progress control objectives; 3.

4.

Supervision work flow; 3.

Whether the construction unit constructs according to the engineering design documents, engineering construction standards, approved construction organization design and special construction scheme; 2.

Which divisional and subdivisional works need to prepare supervision implementation rules? What are the preparation basis and main contents? Supervision Implementation Rules shall be prepared for projects with new materials, new processes, new technologies and new equipment, as well as divisional and subdivisional projects with strong professionalism and high risk.

Check the survey results of construction plane control network, elevation control network and temporary benchmark and the protection measures of control piles.

Whether the engineering materials, components, fittings and equipment used are qualified; 3.

7.

2.

Review the cost claim Claim review form.

The compilation and review procedures shall comply with relevant regulations; 2 safety technical measures shall comply with mandatory standards for project construction.

Material: V construction copyright belongs to the original author note: please read carefully, the essence of the 20 specification is concentrated, this article applies to housing construction, municipal roads, bridges, railways, drainage pipes and other works.

The construction unit fails to construct according to the reviewed engineering design documents; 3.

Check the qualification certificate of surveying personnel of the construction unit and the verification certificate of measuring equipment; 2.

The access road, water, electricity and communication have met the commencement requirements.

Qualification certificate of test personnel.

Supervision Theory Part 1.

Performance of similar projects; 4.

Review the special scheme submitted by the construction unit for approval; 5.

8.

What are the main contents of supervision personnel’s patrol inspection on project construction quality? 1.

The construction progress, construction scheme and project quality assurance measures shall meet the requirements of the construction contract; 3 resources (capital, labor, materials and equipment) supply plan shall meet the needs of project construction; 4 safety technical measures shall meet the mandatory standards of project construction; 5 the general layout of construction shall be scientific and reasonable.

The supply plan of construction personnel, engineering materials, construction machinery and other resources shall meet the needs of the construction schedule; 5.

The construction schedule shall comply with the construction period in the construction contract; 2.

The construction organization design has been signed by the chief supervision engineer; 3.

Qualification certificates of full-time management personnel and special operation personnel.