The revision of the national standard “Code for Design of Comprehensive Hospital Buildings” will be implemented from February 1st next year


The partially revised provisions of the national standard “Code for Design of General Hospital Buildings” (GB51039-2014) are now approved and will be implemented from February 1, 2025.

formwork prop nut

The standard name has been changed to ‘Design Standards for Comprehensive Hospital Buildings’.

.

Tags:

Related Post

[Construction Engineering Column] Management Measures for Real Name System of Construction Workers (Trial) (revised in 2022)[Construction Engineering Column] Management Measures for Real Name System of Construction Workers (Trial) (revised in 2022)

Article 9 Project management personnel such as project leader, technical leader, quality leader, safety leader, labor leader, etc. Article 10 Construction workers shall cooperate with relevant departments and construction enterprises