Talent is the foundation of Songjiang’s sustainable development.
Click the end of the text“.
Combined with the overall urban design of Songjiang New Town, in the future, the “low, small and scattered” enterprises in the industrial and urban integration demonstration zone of the economic development zone where the plot is located will be continuously vacated, the headquarters economy will be introduced, the overall renewal will be realized in the long term, and a land composite development mode focusing on residential, commercial, office and public service support will be formed.
The relevant person in charge of the Management Committee of the Economic Development Zone said that the active promotion of residential projects will provide a better living guarantee for the gathering of medium and high-end scientific and technological innovation talents in Songjiang.
According to the location diagram of the land to be transferred, the land to be transferred is located in the south of bustling road, the north of Minolta Road, the west of Dongjing port and the east of Dongjing road.
It is the core area of the Central Park of the economic development zone.
The land sold this time covers an area of 95 mu, the planned plot ratio is 2.0, and the planned height limit is 50 meters.
More living facilities will be planned around the plot: the main window of the urban interface will be formed on both sides of Songdong road and the south of Minolta road to create public open spaces such as catering, hotel and leisure and high-end industrial agglomeration areas; Living areas will be built to the west of Fangta North Road, the east of Husong road and both sides of Minolta road.
The plot is conveniently located, about 5 minutes’ drive from the east entrance of G60 Songjiang, about 7 minutes’ drive from Songjiang New Town station of rail transit line 9, and less than 20 minutes’ drive from the Songjiang hub under construction.
The goal of the economic development zone is to create a first-class talent cluster with a first-class industrial cluster, enable a high-quality industrial chain with a high-quality talent chain, accelerate the upgrading of the industrial chain, and realize the continuous transformation of old and new driving forces, Inject continuous power into the high-quality development of Songjiang.
Schematic diagram of the location of the plot to be transferred.
Convenient transportation, hydrophilic and livable, complete surrounding education and medical facilities, and the gathering of the world’s top 500 enterprises and industry leaders…
Schematic diagram of the location of the plot to be transferred.
In the national Songjiang Economic and Technological Development Zone of Shanghai, are you excited about such a high-quality residential community built around the concept of “comfort, ecology, science and technology and health”? Close to the needs of building a world-class industrial cluster and focusing on the focus of “talents living in peace”, the first pure residential land in the phase I industry city integration demonstration area of the Central Park of Songjiang Economic Development Zone is expected to be sold in mid and late February this year.
To retain talents, the key is to solve the worries of talents.
At the same time, as one of the “five new towns” in Shanghai, Songjiang new town will be a comprehensive node city with radiation driving effect in the urban agglomeration of the Yangtze River Delta in the future.
It will be a growth pole for high-quality industrial development, an important bearing area of the five oriented economy and a demonstration benchmark for the integrated development of industry and city.
After completion, the total construction area can reach 126800 square meters.
The G60 science and innovation corridor in the Yangtze River Delta, the general plan of the unit where the plot to be transferred is located, has evolved from an expressway to a “new engine” for higher quality integrated development in the Yangtze River Delta, and Songjiang is its source.