This project is the block 04 project in the middle area of Longyang Road transportation hub, Base location: ▷ east to Huangtong Road ▷ south to Qiancheng Road ▷ West to Shenbo North Road ▷ north to Longtong road ★ nature of construction project: commercial and office (including 10000 square meters of Citizen Service Center) plot planning basis: planning Name: implementation of regulatory detailed planning for blocks 02 and 04 of z000501 (east of Baiyang Road) in beicaipeihua community, Pudong New Area (plan update) construction content: proposed six towers and podiums The main economic and technical indicators of the basement: land area: 60897.40 square meters, total construction area: 548730.81 square meters, of which the aboveground construction area: 322533.24 square meters, the underground construction area: 226197.57 square meters, the green space rate: 20%, the building scheme drawing of block 04 commercial office project in the middle area of Longyang Road transportation hub (plan update) is mainly adjusted to improve the overall architectural image of the area, And strengthen the connection between neighborhoods 04, 03 and 07, and increase the interaction between public activity space and buildings
.
Online and on-site simultaneous publicity is adopted for publicity
.
On site publicity address: near the fence of the project construction base
.
Let’s have a look with Xiaobu for more project details → commercial office project in block 04, middle area of Longyang Road Transportation Hub Name of construction project: commercial office project of block 04 in the middle area of Longyang Road transportation hub construction unit: Shanghai Dechang Real Estate Co., Ltd
.
Adjustment of tower control range: the tower control range of six plots in neighborhoods 04 is partially adjusted by 5-10m
.
2
.
Good news, there are new planning and design trends in the middle area of Longyang Road hub! A new commercial office project with a total construction area of about 540000 M2 will be added here
.
Publicity website: www.pudong.gov.cn/gtj/ this publicity adopts written letter to listen to public opinions: please send the letter of feedback to Pudong New Area Planning and natural resources bureau, building 2, No
.
Adjustment of line sticking rate: the line sticking rate of Longtong road in plot 04-02 is adjusted from greater than or equal to 70% to greater than or equal to 65%, and the line sticking rate of Qiancheng road in plot 04-06 is adjusted from greater than or equal to 70% to greater than or equal to 65%
.
New connecting channels: four connecting channels (with variable location) are added on the second floor above the ground to connect plots 04-04 and 03-04, 04-03 and 07-01, 04-06 and 07-02, 04-02 and 02-02 respectively
.
It can also be reflected in relevant towns and streets where the project is located
.
3
. Fixing Socket Angular End Nail Plate
After the original plan is updated, the base of the new project is closely connected with the surrounding plots, and an air corridor connecting the surrounding plots and each building of the project is set up, creating a convenient pedestrian network system
.
Editor: Li Zhihao*
.
Watch the latest effect with Xiaobu! Looking at these modern renderings, Xiao Bu can’t wait to offer three or five friends to visit when the project is launched! Deadline for feedback on publicity details: before July 7, 2021, the postmark shall prevail
.
construction project address: block 04-01, 04-02, 04-03, 04-04, 04-05 and 04-06, unit z000501, beicaipeihua community, Pudong New Area △ Click to view the high-definition large picture project introduction
.
The adjustments are as follows: 1
.
475 Jin’an East Road, zip code: 201204; Please indicate “opinions on project scheme publicity” on the cover of the letter
.