The total construction area is about 8000 M2! Danyang a new center in different places here Look!


88, Lanling Road, Development Zone) The notice period shall be 3 working days from the date of this announcement

.

9), the policy of government procurement to support the development of prison enterprises (Treasury [2014] No

.

Performance period of the contract: 10 days after the signing of the contract, the schematic design shall be completed and submitted to Party A, and 35 days after the scheme is approved, the construction drawing design shall be completed

.

88, Lanling Road, Development Zone) opening time: Room 6, bid evaluation, 2nd floor, Danyang public resources trading center (No

.

Xiaobian rushed to the proposed location of the blood station

.

Access to procurement documents: from December 11, 2020 to December 18, 2020, 8:30 to 11:30 a.m

.

The functions of pre hospital emergency center include command and control room (no less than 120 m2), consultation room (no less than 60 m2), information room (no less than 50 m2), garage, isolation room (medical dressing room, driver’s dressing room, medical disinfection room, vehicle disinfection room (2 rooms), central disinfection room

.

3

.

Two, small and micro businesses novel coronavirus pneumonia, the applicant’s eligibility requirement 1

.

2

.

7

.

Other supplementary matters 1

.

(Beijing time, except legal holidays) location: consultation department, 4th floor, No

.

The quotation of small and micro enterprises will be deducted by 10%, and the deducted price will be used to participate in the review.

.

Specific qualification requirements for the project: (1) the bidder shall provide a copy of the business license (if the bidder is in the people’s Republic of China, it shall provide it); (2) the bidder shall have grade a comprehensive engineering design qualification or grade a construction industry qualification; (3) the person in charge of the project to be selected by the bidder shall have grade a national registered architect

.

3

.

At present, the construction site has been fenced, and the temporary road has access road

.

Method: e-mail ﹣ price: 300 yuan / copy (no charge for the production of procurement documents for small and micro enterprises, excluding medium-sized enterprises) Deadline for submission of documents: 14:00, December 22, 2020 (Beijing time) location: Room 2, bid opening, 4th floor, Danyang public resources trading center (No

.

Danyang blood station (including prehospital emergency center) has new news about the new project from Danju road

.

Hall (blood donation registration, consultation and physical examination, blood test before blood donation) and single collection (230-330 m2) are equipped to meet the above functions, Whole blood collection (120-160 m2), waiting area (150-200 m2), rest area after collection (120-160 m2), dining area for blood donors (150-200 m2), volunteer activities, propaganda and Education (no less than 100 m2), ingredient preparation (no less than 250 m2), blood bank (no less than 220 m2), blood sending place (12-15 m2), blood return place (12-15 m2), key material warehouse (no less than 90 m2), general material warehouse (no less than 90 m2), etc Material storehouse (no less than 25 m2), single collection temporary storehouse (about 15 m2), external collection temporary storehouse (about 15 m2), conference training room (about 20 m2), internal collection office (7 persons), external collection office (12 persons), preparation and supply office (8 persons), blood bank duty room (1 person standard room), driver’s Office (2 person standard room), internal collection changing room, external collection changing room, preparation and supply changing room Blood collection hall, administration department, laboratory (about 300 m2), Sample receiving and processing room (about 40 m2), inspection material warehouse (about 15 m2), reagent warehouse (about 20 m2), report room (about 25 m2), sample warehouse (about 15 m2), quality control operation room (about 25 m2), inspection and quality control office (7 persons), archives room (no less than 150 m2), stationmaster room, deputy stationmaster room, finance room, office, general affairs department, central conference room (branch activity room, trade union room) There are two rooms: small meeting room, printing room, duty room (standard room), administrative archives room, financial reference room, computer room and monitoring room

.

It is understood that the construction needs to start after the relevant documents are issued

.

Consortium is not accepted for this project

.

meets the twenty-second requirements of the People’s Republic of China government procurement act; 2., the eligibility requirements for implementing the government procurement policy: this project supports the policy of government procurement to promote the development of SMEs, and the notice of Jiangsu Provincial Department of Finance on increasing government procurement support for small and micro enterprises during the period of prevention and control of new crown pneumonia (Su Cai) The policy of government procurement to encourage the purchase of energy-saving and environmental protection products (Treasury [2019] No

.

141)

.

68), and the policy of government procurement to promote the employment of the disabled (Treasury [2017] No

.

88, Lanling Road, Development Zone) opening time: 14:15, December 22, 2020 (Beijing time) location: Room 2, bid evaluation, 4th floor, Danyang public resources trading center (No

.

Recently, the planning map has been exposed

.

To tell you the truth, it’s really hard to find

.

Complete the scheme design of the project (including effect drawing design, general layout design, single building plan, elevation, section drawing and other professional design description and important drawing performance, comprehensive management design scheme, landscape scheme, building facade scheme, etc.) construction drawing design (including general layout construction drawing, single building construction drawing, decoration construction drawing, comprehensive management construction drawing, road construction drawing, etc.) Landscape construction drawing, building facade construction drawing, lighting construction drawing, etc.) and related preliminary design, planning, drawing review and post service

.

The main process of blood collection and supply in Danyang blood station is blood donation registration, consultation and physical examination, blood test before blood donation, waiting for collection, rest, blood collection (whole blood, single collection), component preparation, storage, distribution and material storage

.

and 13:30 to 17:30 p.m

.

The project covers an area of about 31.3 mu, with a total construction area of about 8000 square meters, including about 5000 square meters of Danyang blood station, about 2500 square meters of pre hospital emergency center, and about 500 square meters of guard room and other ancillary rooms

.

Auxiliary rooms are divided into business room and logistics room, including duty room, administrative office, comprehensive room, training room, dining room (catering for 70 people), material warehouse (no less than 3, each no less than 45 m2), indoor garage (no less than 6, net height no less than 3.2 m), power distribution room, generator room, fire control room, temporary storage of medical waste, sewage treatment room, etc

.

4, West Ring Road, Danyang City

.

Let’s explore the way first and have a look at the scene together! The new address belongs to Xuejia village of Situ Town, which is located at the intersection of the two roads to the south of the extension of Xinmin West Road and the west of the West Third Ring Road

.

Announced from the site planning project, it is planned to be completed by the end of 2022

.

(perspective effect drawing of prehospital emergency center) (perspective effect drawing of blood station) (overall construction effect drawing) (site layout drawing) — – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – Project Name: Danyang blood station (including prehospital emergency center) new design project in different places ﹣ procurement method: competitive negotiation ﹣ budget amount: 878970 yuan ﹣ ceiling price: 878970 yuan ﹣ procurement demand: the total construction area of the project is about 8000 square meters, including about 5000 square meters of Danyang blood station, about 2500 square meters of prehospital emergency center, and about 500 square meters of guard room

.

The supplier shall provide the following materials to the agency for on-site registration: (1) business license (copy with official seal); (2) declaration letter of small and medium-sized enterprises

.

Tags:

Related Post