Level 1 Level 2 Level 3 Level 4 Level 1 Level 2 Level 3 Level 4 Base Camp Level 1234567891011121314 Number of Builds 5555555555555 * Size 2×2 Gold Token Reduction: No level damage Every time damage is repaired Every time HP is repaired Every second Cost of construction Time to gain experience requires base camp level 1N/AN/AN/A250 * * No 01280325037.51000.95 million 10 days 929143100405541.25130012.5 million 12 days 1018144120486045160.15 million 14 days 1099 14 Gold Token Reduction: 10% level damage, every second damage, every second repair, every time life value construction cost, construction time and experience are required to obtain base camp level 1N/AN/AN/A250 * * No 012803250375100.855 million 9 days, 929143100405541.25130011.25 million 10 days, 19:12 minutes, 101814412048604516001.395 million 12 days, 14:24 minutes, 109914 Gold Token Reduction: 15% level damage, every second damage, every repair, every time life value construction cost, every time Building time to gain experience requires a base camp level of 1N/AN/AN/A250 * * No 01280325037.510008075 thousand eight days at 12:00, 929143100405541.25130010625 thousand ten days at 4:48, 101814412048604516013.175 thousand eleven days at 21:36, 109914 Gold token reduction: 20% level damage per second, each damage repair per second, each life value construction cost per second, building time to gain experience requires a base camp level of 1N/AN/AN/A250 * * No 01280325037.51000760 thousand eight days at 929 143,100,405,541.251300 million nine days 14:24 minutes 1,018,144,120,486,045,160,124 million 11 days 4:48 minutes 109,914 Range attack speed Damage type Target type 70.4 seconds Single target ground&air range repair speed Target type 70.75 seconds 28 Building information construction cost (first): N/A construction cost (second): 250 construction cost (third): 500 construction cost (fourth): 1000 construction cost (fifth): 2000..
Tribal Conflict: Building Worker’s Cabin Data
Related Post
These illegal buildings in Longgang will be demolished in accordance with the law!These illegal buildings in Longgang will be demolished in accordance with the law!
Longgang Citizen Online follows Longgang Citizen Online, a mobile platform for Longgang Citizen themselves. In the early stage of dismantling illegal prefabricated houses, Pacao First Community and the Party Committee
[Additive manufacturing] Building components made of natural fibers push the sustainability of 3D printing to a new height[Additive manufacturing] Building components made of natural fibers push the sustainability of 3D printing to a new height
In the 3DNaturDruck project, building components such as elevation elements will be created from 3D printed natural fiber reinforced biopolymers. 3D printing (also known as “additive manufacturing”) has been applied
Another construction central enterprise leadership adjustment!Another construction central enterprise leadership adjustment!
In August 2015, he served as a member of the Standing Committee of the Party committee of China Energy Construction Group Co., Ltd . Plastic Nail Plate and retired .