Unit price of construction cost involved in evaluation


The standards are different from place to place..

The core area can reach more than 3 million yuan / mu, and the cost of one-way land is higher; The first tier cities even have a land cost of more than 20000 yuan / square meter; The cost per square meter of land in the third tier cities and counties is relatively low, generally 100-500 yuan / square meter, and sometimes more than 2000 yuan / square meter; The land tax and early-stage fee are generally about 15% of the land fee, and the second tier cities are generally 100-500 yuan / square meter.

There are also simple decoration of 300 yuan / square meter, and more high-end decoration of 3000-10000 yuan / square meter (carry in).

The cost is 90-300 yuan / square meter, generally 90-150 yuan / square meter.

Therefore, the converted house price is 525-1500 yuan / m2; the central area of the urban area is generally 2 million yuan / mu, and the converted house price is 1500-3000 yuan / m2.

The above does not include the cost of corruption caused by the development of some state-owned enterprises.

The general project is about 100 yuan / m2; Labor cost: 130 ~ 200 yuan / m2; Outdoor supporting works: 30-300 yuan / m2, generally about 70-100 yuan / m2; Formwork, support and scaffold works (cost): 70 ~ 150 yuan / m2; Tower cranes, people and goods elevators, elevators and other construction machinery (about 5-8% of the total cost): About 60-90 yuan / m2; temporary facilities (living quarters, office areas, warehouses, roads, other temporary facilities on site (water, electricity, sewage, image, production shed and other production rooms): 30-50 yuan / m2; Inspection, test, formalities, transportation, communication and other expenses: 10-30 yuan / m2; Contractor’s management fee, data, labor insurance, profit and other expenses (about 10%): sum of the above items * 10% = 90 ~ 180 yuan / m2; Various national taxes and fees (3.3-3.5% of the total cost): 33-70 yuan / m2, and high-end ones may be as high as 100 yuan / m2.

As the price of construction works varies with the market, the following prices are for reference only.

If high-grade aluminum alloy doors and windows are used, it may reach 300 yuan / square meter; Decoration works of earthwork, entrance door, flue and public parts: 30 ~ 150 yuan / m2 (it is closely related to the grade of the community, and the higher the grade, the higher the cost); Basement (if any): increase the cost by 40 ~ 100 yuan / m2 (high multi-layer content and low high-rise content); Elevator project (if any): 40-200 yuan / m2, which is closely related to the elevator grade, the number of elevators and the number of floors.

The cost of fine decoration is generally 500-1500 yuan / square meter, which depends on the grade.

Thread Swivel Eye

Formwork: 22-45 yuan / square meter (plastered surface); concrete: 45-50 yuan / vertical reinforcement: 600-850 yuan / ton; or binding one square meter: 20-37 yuan; masonry: 90-150 yuan / vertical plastering: 10-18 yuan / square meter (excluding door and window openings, excluding scaffold erection and dismantling); face brick pasting: the contracted wall area is 35-45 Floor: 28 yuan / m2 (modified); indoor floor tiles: (600 * 600) 28 yuan / m2; skirting line: 12 yuan / m2; indoor wall tiles: 30 yuan / m2 (including chamfering); staircase stone: 45 yuan / m2; tread board edging: 16 yuan / m2; gypsum board ceiling: 26 yuan (flat shed) Aluminum gusset plate hanging item: 35 yuan / m2; squatting platform partition: 180-360 yuan / rub position large white emulsion paint: 16 yuan / m2; external wall brick: 65 yuan / m2; external wall dry hanging mushroom stone: 90 yuan / m2; roof hanging tile: 43 yuan / m2; water heating: 22 yuan / m2 (building area); residential electrical lighting: 23-26 yuan / m2; scaffolder: 15-19 yuan / m2; climbing frame: 13-16 yuan, excluding drawing changes during construction, Municipal decoration frame: 18-32 yuan (actual construction area); real estate construction cost (calculated by building square meter); pile foundation project (if any): 70-100 yuan / square meter; Reinforcement: 40 ~ 75kg / m2 (low multi-layer content and high-rise content), equivalent to 160 ~ 300 yuan / m2; Concrete: 0.3 ~ 0.5 m3 / m2 (low multi-layer content and high-rise content), equivalent to 100 ~ 165 yuan / m2; Masonry works: 60-120 yuan / m2 (high content of multi-storey and low content of high-rise); Plastering works: 25 ~ 40 yuan / m2; Exterior wall works (including thermal insulation): 50-100 yuan / m2 (based on the standard of general coating, if it is stone or curtain wall, it may be as high as 300-1000 yuan / m2; indoor water and electricity installation works (including fire protection): 60-120 yuan / m2 (according to the grade of the community, the multi-layer is slightly lower); Roof works: 15-30 yuan / m2 (high content of multi-layer and low content of high-rise); Door and window works (excluding entrance doors): the area of doors and windows per square meter of building area is about 0.25-0.5 square meters (it is closely related to the design and whether it is high-grade, and the proportion of high-grade is large).

Design cost (including the cost during the preliminary design concept): 15-100 yuan / m2; Supervision fee: 3 ~ 30 yuan / m2; Advertising, planning and sales agency fees: generally 30-200 yuan / square meter, and the higher can reach more than 500 yuan / square meter; Land cost: generally, the urban area (old suburban area) of the second tier cities is 700000-1 million yuan / mu, and the plot ratio is generally 1.0-2.0.

The above is not refined decoration, and the general cost is about 1000-2000 yuan / m2, and the high-end community can reach more than 3500 yuan.

Tags: