Urgent notice, 2022 change of interview time for qualification review of senior engineers in architecture (construction discipline)


There are 281 applicants.

According to the spirit of the Notice of Shaoxing Municipal Human Resources and Social Security Bureau on Doing a Good Job in the Evaluation of the Qualifications for the Middle and Senior Professional and Technical Positions of the City’s Construction Engineering Profession in 2022 (Shao Shi Ren She Zhi [2022] No.

Flanged Wing Nut

3.

2.

12), it is planned to organize the interview and defense of the professional and technical qualifications of senior engineers in the construction (construction) in 2022 in the near future.

Applicants participating in the morning defense must report to the corresponding waiting room with their ID cards within the validity period before 8:00 and 13:00 respectively.

The respondent shall consciously abide by the Rules for Defense (Annex 2) and obey the management of the staff.

The objects of defense have passed the qualification review of senior engineers in architecture (construction) in 2022.

Those who fail to report at the specified time and place shall be disqualified for defense.

The relevant matters are notified as follows: 1.

The number of the defense groups, the corresponding waiting room and the defense room will be announced on the second floor of the teaching building of the Municipal Party School on the day of defense.

The defense reference materials can be found on Shaoxing Human Resources and Social Security Network( http://rsj.sx.gov.cn/ )–Government Affairs Publicity – Special Column – Professional and Technical Qualification Evaluation Division.

See the List of Interviewed Respondents for details (Appendix 1, please pay attention to the time of personal defense).

The defense time is November 13, 2022, a total of 1 day and 2 days Place of defense: Floor 3, Teaching Building of the Party School of the CPC Shaoxing Municipal Committee (No.

8, Yangming Road, Yuecheng District, Shaoxing City).

4、 Other matters 1.

Tags:

Related Post

Building structure – the world’s first “horizontal skyscraper”: “lying and winning” is not easy. It all depends on black technology!Building structure – the world’s first “horizontal skyscraper”: “lying and winning” is not easy. It all depends on black technology!

Trapezoid Rubber Magnetic Chamfer Recently, CCTV’s large-scale financial documentary “big country construction” once again “brought fire” the horizontal skyscraper. Star setting: enter the official account homepage, click the “top” corner,

The preparation, composition and first working meeting of CECS Standard Technical Specification for Monitoring of Prestressed ConcreteThe preparation, composition and first working meeting of CECS Standard Technical Specification for Monitoring of Prestressed Concrete

Finally, highly recognized and supported the preparation of Technical Specification for Monitoring of Prestressed Concrete Structures, read out the list of members of the preparation team and announced the establishment