What are the requirements for regulating site capacity( First construction examination, accumulation of short answer questions of architecture major, one recitation per day, 21011 – construction plan design)


The official account number of the official account is located: using fragments time to learn a professional knowledge of architecture, making full use of the time of fragmentation, and contributing 10-20 points to the construction examination, passed the examination successfully

.

Learning plan: the official account combines the high frequency knowledge points of the real topics of the past years, and updates the high-frequency test sites, and makes comparisons between the easy and misleading knowledge points

.

(point praise, point is watching, dry cargo will be received regularly, and the information will be summarized before the examination, 3 pages before the examination

.

Easily confused knowledge points, comparative materials, etc.) 1

.

Recite today → 2

.

Key words → 3

.

The original text (reciting short answers is the key to passing the exam) (5) standardize the site content: 1) the construction plan design should be scientific and reasonable, the temporary buildings, material stacking and mechanical equipment positioning should be accurate, and the construction site should be green and environmentally friendly

.

2) Set up temporary maintenance facilities around the construction site according to the requirements of relevant specifications

.

3) Smooth drainage system shall be set along the temporary road in the site

.

4) The main roads and material processing ground on the construction site shall be hardened, such as laying concrete, steel plate, gravel and other methods

.

Measures such as covering, curing or greening shall be taken for exposed sites and stacked earthwork

.

5) Dust prevention measures shall be taken for the operation on the construction site

.

The main roads shall be watered and cleaned regularly according to the climatic conditions

.

6) Fixed areas shall be set for closed management of construction waste and cleared and transported in time

.

7) Greening layout can be carried out according to the site conditions

.

  1

.

Recite today → 2

.

Key words → 3

.

The original text (be sure to see the key words) (5) standardize the site content: 1) plan, temporary buildings, material stacking and mechanical equipment, construction site

.

2) Temporary maintenance facilities

.

3) Drainage system

.

4) Hardening treatment

.

Exposed site and stacked earthwork

.

5) Prevent dust

.

6) Construction waste

.

1

.

Recite today → 2

.

Key words → 3

.

Original text (read the original text to deepen the impression) click the business card below to get more information.

.

Tags:

Related Post

Administrative measures for cognizance, investigation and punishment of illegal acts in contract awarding and contracting of construction projectsAdministrative measures for cognizance, investigation and punishment of illegal acts in contract awarding and contracting of construction projects

Notice of the Ministry of housing and urban rural development on printing and distributing the administrative measures for the identification, investigation and punishment of illegal acts of construction project contracting