With the graceful combination of architectural aesthetics and practicability, the architectural experiment center of Weishui campus of


Office space: studio, office, teaching and research room, conference room, reference room, activity room and other scientific research and administrative office space are set as required.

Public facilities such as coffee shop and book bar will be set in the hall.

The central space forms a pillar free and open public place with clear vision and open space.

The two college experimental buildings have independent high entrance halls and are closely connected through the air corridor bridge in the central hall.

At present, the experimental building and geotechnical experimental center of the College of construction engineering and materials have been completed and accepted.

The corridor connects the experimental building of the College of construction engineering and materials with the corridor of the geotechnical experimental center.

The architectural experimental center of Weishui campus of Chang’an University has become one of the remarkable new landmarks of the north campus with its simple and atmospheric building integrated design.

Each floor of the building is connected to each other through an efficient ring road.

The design concept experiment center has novel and advanced design concept and modern design style.

Second to fourth floors: Cement chamber, mortar chamber, compaction chamber, shear consolidation chamber, waterproof material chamber, aggregate chamber, liquid plastic limit chamber, triaxial chamber, particle separation chamber, asphalt chamber, etc.

The large steps at the entrance are cleverly designed.

The overall design saves land, energy and materials.

The use of partial glass curtain appropriately connects the outdoor high-speed rail landscape and campus landscape.

The two are connected through the landscape corridor, with a total construction area of 39103m ², Among them, the aboveground area is 35540 M ², Underground area 3563m ²。 Function overview the experimental building of the College of construction engineering and materials is mainly used for relevant laboratories and scientific research offices of the College of construction engineering and materials.

Shared Hall: shared Hall: 46.8m long from east to west and 12m wide from north to south.

Strengthen the construction of scientific research platform, promote discipline integration and resource allocation, and help the “double first-class” construction of the construction experimental center of Weishui campus of Chang’an University.

The experimental center extends along the direction of high-speed railway.

The building facade uses stone and glass curtain wall.

The laboratory building of the college is connected with the geotechnical experiment center through a semi open space with a dome.

An outdoor rotating staircase is set on the first floor, and the indoor shared hall is realized on the second and third floors through circular arc curtain walls.

There are four vertical elevators connecting the north and south, and there are four horizontal elevators connecting the north and south.

Natural lighting ceiling not only saves energy, but also brings comfortable learning and working experience to teachers and students.

The experimental building of the College of construction engineering and materials is a building with 1 floor underground and 10 floors above the ground, with a height of 45.35m; The geotechnical experiment center is a four storey building with a height of 20.15m.

The construction experimental center of Weishui campus of Chang’an University will be put into use.

are set up.

According to the characteristics and needs of the laboratory, the building adopts split air conditioning and sunvisor system outside the concave window, Low-E insulating glass to isolate the heat in summer and the noise of nearby high-speed railway, natural lighting in the central hall and lobby, and floor heating in winter.

First floor: material storage yard, stone room, asphalt mixture forming room, mechanics room, cement concrete forming room, etc.

Daylighting roof: the overall shape is wavy, which not only provides natural daylighting for the hall, but also provides interesting and changeable light and shadow effects.

Planting tree boxes can be set under the dome, which is moistened by wind and rain all year round.

After the completion of the project, it will promote the discipline integration and resource allocation of the school, form a large civil engineering discipline group together with the highway infrastructure innovation and construction platform, and provide infrastructure guarantee for the “double first-class” discipline construction of the school.

Large stairs, sightseeing elevators, rotating stairs and corridors not only solve the problem of layered traffic, but also connect the open atrium visually and physically.

The sun shines from the 90 degree folded glass ceiling, bringing teachers and students a grand and three-dimensional feeling of space.

The geotechnical experiment center is mainly used for the experimental teaching of geotechnical building materials and the preparation of test pieces for relevant scientific research experiments.

The carefully arranged space shortens the distance between the central space and other spaces and provides broad communication space for teachers and students.

The growth of green plants implies the continuous improvement of our scientific research strength.

Laboratory: according to the preliminary design, high-performance mixture forming room, mechanical property measurement room, building energy laboratory, building water supply and drainage laboratory, etc.

The interworking can be realized on the second floor and the fourth floor, and a planting flower bed is set on the fourth floor.

A glass daylighting roof is set at 33.7m (eighth floor), forming a central hall.

✦ daily epidemic prevention tips rotation ✦ production / data source of the Publicity Department of the Party committee / pictures of the infrastructure department / dynamic picture production of the infrastructure department, Liang Yiwei, Li Jiawei, Yan Jiayu and Yan Zihan / video production of Liang Yiwei / editor of Wang Yuxuan / editor in charge of Huang Tianyi / Wang Zhen /..

The vast space provides changeable possibilities in which teachers and students can carry out rich activities.

The construction experimental center of Weishui campus of Chang’an University is located in the southwest of the north campus, adjacent to the high-speed railway line in the south, with a total construction area of 51885m ²。 The project consists of three single projects: the experimental building of the College of construction engineering and materials, the geotechnical experiment center and the structural experiment center.

Magnetic Box

The rhythmic glass windows on the facade of the building endow the building with an elegant vertical beauty.

Tags:

Related Post