IF BUIDING GREAT Precast Update at the right time | Harbin Institute of Technology Architectural Design and Research Institute Co., Ltd. Urban Renewal Team

Update at the right time | Harbin Institute of Technology Architectural Design and Research Institute Co., Ltd. Urban Renewal Team


The main venue for the opening and closing ceremonies of the 9th Harbin Asian Winter Games was renovated from the original exhibition hall of Harbin International Convention and Exhibition Sports Center.

Rebar Bolsters

The design used scientific methods to remove the partitions between exhibition halls B and C, forming a grand space with a length of 180 meters, a width of 130 meters, a height of 35 meters, a total seating capacity of 17000, a performance venue of 6000 square meters, and a building area of 38600 square meters.

.

Tags:

Leave a Reply

Your email address will not be published. Required fields are marked *

Related Post

For the smallest school, the most thoughtful design: the architectural poetics and growth temperature of a rural primary schoolFor the smallest school, the most thoughtful design: the architectural poetics and growth temperature of a rural primary school

The architecture adopts a layout of “horizontal extension+vertical linkage”, breaking the rigid pattern of “isolated buildings+corridor connections” in traditional campuses. Crown Foot Anchor The layered terraces and ramps are wrapped