IF BUIDING GREAT Precast Laboratory building design parameters and design guidelines

Laboratory building design parameters and design guidelines


The laboratory opening module should be between 3.

Crown Foot Anchor

3 meters and 4.

0 meters, with a general module of 3 meters, 3.

3 meters, and 3.

6 meters, with 3.

6 meters being preferred.

Tags:

Leave a Reply

Your email address will not be published. Required fields are marked *

Related Post

【 AT 】 UAD Works | Green Clover, Landscape Future City: Hangzhou First People’s Hospital Tonglu Hospital【 AT 】 UAD Works | Green Clover, Landscape Future City: Hangzhou First People’s Hospital Tonglu Hospital

The First People’s Hospital of Hangzhou, Tonglu Hospital, is located in the future urban area of Tonglu High speed Railway, adjacent to Tonglu Station of Hangzhou Huangshan High speed Railway.