IF BUIDING GREAT Precast Upper Austrian Savings Bank Urfahr Campus

Upper Austrian Savings Bank Urfahr Campus


Like existing buildings, the new construction is composed of linear volumes.

Three horizontally staggered blocks rotate slightly off the axis, together forming a complete building.

The height of the blocks varies and gradually rises towards the highest point of the building complex – the existing tower.

The glass cut in the north block echoes the concept of the original building’s suspended cube, establishing a connection between the old and new buildings.

Fixing Socket

.

Tags:

Leave a Reply

Your email address will not be published. Required fields are marked *

Related Post

Update at the right time | Harbin Institute of Technology Architectural Design and Research Institute Co., Ltd. Urban Renewal TeamUpdate at the right time | Harbin Institute of Technology Architectural Design and Research Institute Co., Ltd. Urban Renewal Team

The main venue for the opening and closing ceremonies of the 9th Harbin Asian Winter Games was renovated from the original exhibition hall of Harbin International Convention and Exhibition Sports