2. According to the notice requirements of the Provincial Department of Housing and Urban Rural Development on forwarding the opinions of the General Office of the Ministry of Housing and
Category: Precast
The losses caused by work stoppage and slowdown comply with the provisions on the composition of construction and installation engineeringThe losses caused by work stoppage and slowdown comply with the provisions on the composition of construction and installation engineering
2. Regarding the definition of shutdown losses, both the employer and contractor should inspect and settle the affected projects, engineering equipment, and materials that have been suspended in the presence
Recruitment for Zhongyi Construction Engineering Decoration Co., Ltd. – Lincang RecruitmentRecruitment for Zhongyi Construction Engineering Decoration Co., Ltd. – Lincang Recruitment
The boss has 18 years of decoration experience and provides one-stop services for whole house decoration, making decoration simple, saving time, effort, worry, and money! Sales Manager New Number: No
The Municipal Housing and Urban Rural Development Bureau conducts a special inspection on flood prevention and safety at construction sitesThe Municipal Housing and Urban Rural Development Bureau conducts a special inspection on flood prevention and safety at construction sites
They urged the project department to increase the inspection of the fixed condition of the lifting machinery equipment foundation, improve the equipment’s wind and rain resistance Provide lightning protection and
Shenzhen Recruitment | Shenzhen Campus – Metaphysical Architecture Studio: Project Architect, Assistant Architect, Construction DrawingShenzhen Recruitment | Shenzhen Campus – Metaphysical Architecture Studio: Project Architect, Assistant Architect, Construction Drawing
The studio’s creations return to and focus on the origin of architectural ontology and urbanism, based on the holistic thinking perspective of the city as an organism, systematically analyzing the
Promote the full process application of Building Information Model (BIM)! Notice of the General Office of the Wuhan Municipal People’sPromote the full process application of Building Information Model (BIM)! Notice of the General Office of the Wuhan Municipal People’s
In order to implement the requirements of the Ministry of Housing and Urban Rural Development on the construction of intelligent construction pilot cities, vigorously develop intelligent construction, and promote the
Key Points and Strategy Analysis of Cost Control in Construction Project ManagementKey Points and Strategy Analysis of Cost Control in Construction Project Management
In the process of applying the above resources, it is necessary to scientifically and reasonably guide and coordinate work, supervise and guide upcoming or existing deviations, and ultimately achieve the
Can construction enterprises apply for high enterprises?Can construction enterprises apply for high enterprises?
3、 How to choose a field? The selection of high-tech fields is a technological activity, especially for traditional industries such as construction enterprises. Enterprises that do not meet the conditions
The case of “underpayment and overpayment” by construction and installation enterprises in different locationsThe case of “underpayment and overpayment” by construction and installation enterprises in different locations
According to the “Inquiry of Details of Overseas Prepayment and Refund of Construction and Installation Enterprises” module in the third phase of the Golden Tax, A Labor Service Co., Ltd.
What is the role of building qualification certificates?What is the role of building qualification certificates?
The reason for the invalidity of construction contracts with insufficient qualifications is that they violate administrative regulations prohibiting business operations. In principle, they should be deemed invalid. This is a