IF BUIDING GREAT Precast Project Case | Samsung Green Ultra high Assembly Rate Building: Zijin Campus of Zhejiang University Architectural Design and Research

Project Case | Samsung Green Ultra high Assembly Rate Building: Zijin Campus of Zhejiang University Architectural Design and Research


The B1 building of the Zijin Campus of Zhejiang University Architectural Design and Research Institute (hereinafter referred to as B1 building) is located in the Zijin Creative Town in Hangzhou, which is jointly built by the Xihu District People’s Government of Hangzhou and Zhejiang University.

The B1 building is a multi story office building that has been awarded the national AAA level precast building and the three-star green building label for operation.

It is a demonstration project for precast building technology by the Ministry of Housing and Urban Rural Development and a demonstration project for building industrialization in Zhejiang Province.

In this project, the balance between technology, art, and nature becomes the key to design.

In rational construction, we are not bound by technology and emphasize that ‘industrialization also has poetry’, breaking the stereotype of general precast buildings being rough, crude, and cold among the public.

Plastic Nail Plate

.

Tags:

Leave a Reply

Your email address will not be published. Required fields are marked *

Related Post

Can’t the building form be made? 30 selected cases, taking you to experience the beauty of facade texture ‘falling’Can’t the building form be made? 30 selected cases, taking you to experience the beauty of facade texture ‘falling’

In the field of architectural design, roof setback is not simply a “top setback”, but a spatial design technique that balances functionality, aesthetics, and ecology. With its flexible use of