This kind of building actively promotes the whole process engineering consultation, Shaoxing issued a document


The drawing review organization shall calculate the relevant indicators according to the approved feasibility study report (or approved preliminary design scheme) or planning and design conditions

.

By 2025, the advantages of green building and new building industrial cluster in our city will be significantly enhanced, the level of building industrialization, digitization and intellectualization will be greatly improved, a number of leading enterprises with core technology and independent innovation ability will be formed, the upgraded version of “Shaoxing model” will be successfully built, and continue to play a leading role in the national demonstration

.

The key objectives are to implement the primary responsibility of the construction unit and the main responsibility of the construction unit, establish the quality responsibility identification system, and strengthen the management of construction records and acceptance data

.

All districts and counties (cities) should revise it in time according to the situation

.

Prefabricated construction will be implemented in all new public building projects with affordable housing, government investment or mainly government investment; by 2025, prefabricated buildings will account for more than 40% of new buildings in the city

.

By 2025, the proportion of two-star and above green buildings in new civil buildings will reach more than 45%, and the proportion of three-star will reach more than 7%

.

The newly-built houses on the land transferred or allocated in the central urban areas of cities and counties are all fully decorated and finished products delivered; the newly-built commercial houses in other areas are encouraged to be fully decorated and finished products delivered, and the coverage rate of full decoration in the whole city is increasing year by year

.

(3) We will vigorously promote the development of prefabricated steel housing

.

The specific contents are as follows: policy support steel prefabricated housing can be invited for bidding as a technically complex project after being approved according to law

.

For other new projects involving land transfer, the relevant contents and requirements of green building grade, prefabricated construction, steel structure prefabricated construction and residential full decoration shall be specified in the planning and design conditions, and shall be stipulated in the land transfer contract accordingly

.

We should actively promote the application of prefabricated decoration, and give priority to prefabricated decoration in newly built prefabricated civil construction projects invested by the government

.

2、 Key tasks (1) ensure the implementation of the project

.

In addition to government investment or public buildings mainly invested by government, other capital investment or civil buildings in other areas are encouraged to be constructed according to the requirements of two-star and above green buildings.

.

(4) We will steadily promote the development of full decoration of residential buildings

.

Prefabricated construction will be implemented in all new public building projects with affordable housing, government investment or government investment as the main investment; prefabricated construction will be implemented in all new projects transferred or allocated land in the downtown area of Shaoxing; the proportion of newly-built prefabricated civil buildings in other areas will reach more than 30%, and the proportion will increase year by year; by 2025, the proportion of prefabricated buildings in the whole city will account for more than 30% More than 40% of the buildings have been built

.

The main goal of the city’s urban construction land (except farmers’ self built houses) new civil buildings to achieve full coverage of one star green buildings

.

(responsible units: the municipal development and Reform Commission, the Municipal Bureau of natural resources and planning, the Municipal Bureau of construction, and the governments of all districts and counties) (2) promoting green buildings and green building materials

.

The newly-built projects on the transferred or allocated land in Shaoxing downtown area are all prefabricated construction; the proportion of newly-built prefabricated civil buildings in other areas is more than 30%, and the proportion increases year by year

.

Increase the application of BIM Technology, and promote the construction units to lead the application of BIM Technology in the planning and preliminary design stages of new construction projects, such as residential buildings with a total floor area of more than 100000 square meters, public buildings with a total floor area of more than 50000 square meters, public buildings with a single floor area of more than 20000 square meters and prefabricated steel buildings

.

By the end of 2022, more than 1 million square meters of steel structure prefabricated houses have been built in the whole city, including more than 100000 square meters of rural steel structure prefabricated houses; by 2025, the proportion of steel structure buildings in prefabricated buildings in the whole city will reach more than 40%

.

By the end of 2022, a total of more than 1 million square meters of prefabricated steel structures will be built in the city

.

Increase financial support for the new construction industry

.

The development and reform department or the administrative approval department shall review them according to relevant requirements, and the natural resources and planning department shall specify them in the project land use documents or project planning permission

.

Wechat platform guide: Recently, Shaoxing Municipal Bureau of housing and urban rural development issued the “implementation opinions” to make it clear that this kind of building actively promotes the whole process of engineering consultation

.

Public buildings invested by the government or mainly invested by the government shall be constructed according to the requirements of three-star green buildings in the urban area, and other counties (cities) shall be constructed according to the requirements of two-star and above green buildings

.

The newly established government invested or government invested new residential projects (including indemnificatory housing, talent rental housing, dormitory buildings, apartments, etc.) will be constructed by steel structure assembly

.

1、 Main objectives (1) to continuously promote the development of green buildings

.

The new projects outside the downtown area of Shaoxing should be implemented according to the special plan for green building in Shaoxing (2017-2025)

.

For new projects invested by the government or mainly invested by the government, the construction unit should add relevant chapters such as green building grade, prefabricated building construction and residential full decoration when preparing the feasibility study report

.

For the prefabricated building project with more than 10 floors, the construction unit can apply for the sectional acceptance of the main structure

.

Shaoxing Municipal People’s Government Office’s implementation opinions on accelerating the development of green building and new building industrialization In the spirit of the guiding opinions on vigorously developing prefabricated buildings (GBF [2016] No

.

Recently, the Shaoxing Municipal Bureau of housing and urban rural development issued the implementation opinions of the office of Shaoxing Municipal People’s Government on accelerating the development of green building and new building industrialization, which will be implemented as of the date of promulgation

.

In the project evaluation, priority should be given to prefabricated buildings and building decoration projects, and special awards for new building industrialization projects should be explored

.

By 2025, the proportion of prefabricated steel structures in the city will reach more than 40%

.

By 2025, the proportion of two-star and above green buildings in new civil buildings will reach more than 45%, and the proportion of three-star will reach more than 7%

.

19), with the consent of the municipal government, the following opinions are put forward

.

For new projects invested by the government or mainly invested by the government, the construction unit shall add relevant chapters such as green building grade, prefabricated building construction and residential full decoration when preparing the feasibility study report

.

Support the implementation of engineering guarantee for prefabricated construction projects, and pay bid bond, performance bond and engineering quality bond

.

71) and the opinions of the general office of the State Council on promoting the sustainable and healthy development of the construction industry (GBF [2017] No

.

EPC mode and whole process engineering consultation should be actively carried out for government invested or government invested new prefabricated construction projects in the whole city

.

The special plan for green building in Shaoxing (2017-2025) should be revised in time

.

(2) Actively promote the development of prefabricated buildings

.

Within the scope of urban construction land (except farmers’ self built houses), new civil buildings will be fully covered by one star green buildings; public buildings invested by the government or mainly invested by the government will be constructed according to the requirements of three-star green buildings in the urban area, and other counties (cities) will be constructed according to the requirements of two-star and above green buildings, and green building materials that meet the requirements will be purchased and used

.

Tags:

Related Post